Himoinsa has developed a hybrid lighting tower with a smart control system that considerably reduces emissions, noise and operating costs - the HBOX+ Hybrid.
The original estimated cost was around €280 million for the 4km cable-stay structure when the contract was awarded by the Danish Road Directorate (Vejdirektoratet).
The road tunnel crossing near London would be the first major UK infrastructure project to use hydrogen to power the heavy machinery of a project’s main contractors.
The Preston Western Distributor Project consists of a new motorway junction - the M55 Junction 2 - a dual carriageway and two connecting link roads in northern England.