Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • myPERI online portal presented in detail for first time during bauma
    January 6, 2017
    myPERI online portal will be presented in detail at a major construction equipment industry trade show for the first time during bauma. It gives customers of the internationally-renowned German formwork solution company round-the-clock access to extensive technical information and specific project data for their PERI construction sites. Project-specific reports, which offer, principally, a detailed overview of material stocks and flows, are said to be particularly advantageous for construction work.
  • myPERI online portal presented in detail for first time during bauma
    February 13, 2013
    myPERI online portal will be presented in detail at a major construction equipment industry trade show for the first time during bauma. It gives customers of the internationally-renowned German formwork solution company round-the-clock access to extensive technical information and specific project data for their PERI construction sites. Project-specific reports, which offer, principally, a detailed overview of material stocks and flows, are said to be particularly advantageous for construction work.
  • Engcon improves tilt-rotator design
    January 6, 2017
    Engcon has introduced a new range of tilt-rotators, using a cast housing to greatly increase capacity. The EC218 and EC226 replace the EC15 and EC20 respectively. The former is suitable for machines up to 18tonnes in operating weight, while the latter is designed for excavators up to 26 tonnes. The cast housing incorporates internal lubrication channels for centralised greasing, reducing the risk of dust ingress or damage while operating. Larger bushes are used to reduce the chance of play in the housing
  • Engcon improves tilt-rotator design
    April 19, 2012
    Engcon has introduced a new range of tilt-rotators, using a cast housing to greatly increase capacity. The EC218 and EC226 replace the EC15 and EC20 respectively. The former is suitable for machines up to 18tonnes in operating weight, while the latter is designed for excavators up to 26 tonnes. The cast housing incorporates internal lubrication channels for centralised greasing, reducing the risk of dust ingress or damage while operating. Larger bushes are used to reduce the chance of play in the housing