Skip to main content

myPERI online portal presented in detail for first time during bauma

myPERI online portal will be presented in detail at a major construction equipment industry trade show for the first time during bauma. It gives customers of the internationally-renowned German formwork solution company round-the-clock access to extensive technical information and specific project data for their PERI construction sites. Project-specific reports, which offer, principally, a detailed overview of material stocks and flows, are said to be particularly advantageous for construction work.
February 13, 2013 Read time: 2 mins
myPERI online portal will be showcased in detail for first time at bauma
myPERI online portal will be presented in detail at a major construction equipment industry trade show for the first time during bauma.

It gives customers of the internationally-renowned German formwork solution company round-the-clock access to extensive technical information and specific project data for their 298 PERI construction sites. Project-specific reports, which offer, principally, a detailed overview of material stocks and flows, are said to be particularly advantageous for construction work.

PERI says the myPERI online portal reports also offer high cost transparency for site managers, simplifies labour processes, accelerates day-to-day site activities and increases overall project control. Access rights for employees can be modified individually to meet the needs of the company in question. As a result, access for one user of myPERI can be restricted to the data for an individual project, or they can be given access to all data from all PERI construction sites for a specific company.

Continually optimised and expanded since its launch in February 2012, the portal was successfully introduced in Austria last year, with other countries due to follow during 2013.

Stand: FGN.N719

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 12745 0 oLinkExternal www.peri.de www.peri.de false /EasySiteWeb/GatewayLink.aspx?alId=12745 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • myPERI online portal presented in detail for first time during bauma
    January 6, 2017
    myPERI online portal will be presented in detail at a major construction equipment industry trade show for the first time during bauma. It gives customers of the internationally-renowned German formwork solution company round-the-clock access to extensive technical information and specific project data for their PERI construction sites. Project-specific reports, which offer, principally, a detailed overview of material stocks and flows, are said to be particularly advantageous for construction work.
  • PERI unveils VARIOKIT heavy-duty truss girder
    January 6, 2017
    PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
  • PERI unveils VARIOKIT heavy-duty truss girder
    April 18, 2013
    PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity
  • PERI’s VARIOKIT as cantilever equipment takes to bauma stage
    January 6, 2017
    PERI’s VARIOKIT engineering construction kit, being showcased at bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years. From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable. Now it can also be used for the balanced cantilever method with a few additional, newly developed system components. The new components for t