Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • ContiTech Conveyor Belt Group showcases MegaPipes solution
    January 6, 2017
    The ContiTech Conveyor Belt Group’s “innovative and environmentally friendly” conveyor belt solutions include the new MegaPipes. With an external diameter of up to 900mm, ContiTech claims the product doubles the capacities compared to conventional closed-trough belts and enables the transport of crushed ore downstream of the primary crusher or of bulky goods in the industrial sector applications.
  • Putzmeister’s new self-propelled pump can be quicker than a truck mount
    January 6, 2017
    Putzmeister’s new BSC 1409 D self-propelled concrete pump is designed for concreting drilled piles on unfinished surfaces and can deliver up to 85m3/hr at a pressure of up to 71bar. Powered by a 6-cylinder Deutz engine producing 129kW, the BSC 1409 D can travel at a maximum speed of 3.6km and does not need supports to be set up each time it moves.
  • Putzmeister’s new self-propelled pump can be quicker than a truck mount
    April 19, 2012
    Putzmeister’s new BSC 1409 D self-propelled concrete pump is designed for concreting drilled piles on unfinished surfaces and can deliver up to 85m3/hr at a pressure of up to 71bar. Powered by a 6-cylinder Deutz engine producing 129kW, the BSC 1409 D can travel at a maximum speed of 3.6km and does not need supports to be set up each time it moves.
  • Hidromek is developing wheeled loaders
    February 6, 2013
    Hidromek is commencing work on developing its new wheeled loader line. Export manager Anil Bingöl said, “We have started our wheeled loader project and we hope to have our first prototype machine this year.” This will feature a 3m3 bucket and will be the first in a range of wheeled loaders from the firm. Machines with bucket capacities of 4m3 and then 5m3 will be developed in due course. Testing of the first prototype will be carried out in Turkey and Bingöl said the firm intends to have its wheeled loaders