Skip to main content

Denmark to create Rodby port to service Fehmarn Belt construction

The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
January 6, 2015 Read time: 2 mins
The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The US$7.5 billion project Visit Youtube Video page false https://www.youtube.com/watch?v=30RECLGlTOg&amp;list=PLWtC1BFtqwwf5HUTn3V2i-P7KlBAVIMEc false false%> is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years.

The tunnel is part of the major infrastructure project called the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Fehmarn Belt Fixed Link Visit femern Website Page false http://www.femern.com/service-menu/press--documents/newsletters/femern-as-newsletter-december-2014/fehmarnbelt-tunnel-will-be-repaid-in-32-years false false%> to connect the German island of Fehmarn with the Danish island of Lolland. The tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Fehmarn is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster. Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The latest financial analysis from the project’s planning company 4782 Femern shows that the repayment period for the Fehmarnbelt project is now shortened to 32 years. This includes both the tunnel between Rødby on Lolland and the town of Puttgarden on the German island of Fehmarn, as well as upgrading the railway between Ringsted on Denmark’s Zealand Island and Rødby.

Earlier calculations showed a repayment period of 39 years. “We welcome the fact that the finances of the Fehmarnbelt project are so strong and that we can hold to our principle of being cautious in the assumptions that underpin the economics of the project,” Femern chief executive Claus Baunkjær said.

Femern A/S is a subsidiary of Sund & Bælt Holding A/S, which is 100% owned by the Danish Ministry of Transport.

For more information on companies in this article

Related Content

  • More demonstrations, more exhibitors at PLANTWORX 2017 in the UK
    January 26, 2017
    The 3rd biennial PLANTWORX Construction Machinery exhibition in the UK is on target to exceed the number of exhibitors at the last show in 2015. With five months to go before opening, 278 exhibitors have signed up, making 86% of exhibition spaces sold, according to the organisers. Of the 278 exhibitors, 74 are new to the event which is hosted the CEA - the UK’s Construction Equipment Association. The biennial event will take place at its established home at Bruntingthorpe Proving Ground in Leicestersh
  • Vietnam Expressway Corp to sell five highway routes
    October 31, 2014
    Vietnam is considering selling its ownership in several major highways to help pay for more road projects. The Ministry of Transport (MoT) recently said that the government’s infrastructure investor body Vietnam Infrastructure Development and Finance Investment (VIDIFI), would sell 70% of its ownership in the Hanoi–Hai Phong Highway project to a buyer from India. The move is part of a strategy that could see Vietnam sell off more of its investment in highway projects, either under construction or complete
  • Liebherr’s HS8300HD crawler uses hybrid drive to reduce fuel consumption
    January 6, 2017
    Liebherr has developed a hybrid drive system for its HS8300HD heavy duty cycle crawler crane. The 350 tonne machine generates electrical power from its hydraulic free-fall winches, which offer up to 50 tonnes of line pull. Under this Pactronic system surplus energy is stored in a hydraulic accumulator and regenerated to assist the engine, reducing fuel consumption. This reuse of energy also cuts emissions from the machine.
  • Innovative vacuum trailer system from D-TEC
    January 6, 2017
    Netherlands-based D-TEC has developed a novel vacuum tank trailer system for applications such as bentonite extraction during sample boring. An innovative steering system is said to allow the D-TEC vacuum tanktrailer to manoeuvre easily on sites where there is little space. This design also reduces tyre scrubbing and allows greater tyre life, cutting running costs over the long term. The tank trailer offers greater load capacity than previously available designs according to the firm, due to its low weight,