Skip to main content

Trakcja and Mostostal Warszawa pick up S61 deal in Poland

A consortium of PRKiI Trakcja and Mostostal Warszawa has signed a contract for construction of an S61 dual carriageway section between the Elk Poludnie to and Wysokie junctions. The work, costing around €159 million, is scheduled for completion in June 2021. The S61 expressway will, when finished, run south from the Polish-Lithuanian border near Budzisko where it will connect with Lithuania’s A5 and intersect with the S8 near Ostrów Mazowiecka. It will also be part of the Via Baltica connecting the Ba
July 25, 2018 Read time: 1 min
A consortium of PRKiI Trakcja and Mostostal Warszawa has signed a contract for construction of an S61 dual carriageway section between the Elk Poludnie to and Wysokie junctions.


The work, costing around €159 million, is scheduled for completion in June 2021.

The S61 expressway will, when finished, run south from the Polish-Lithuanian border near Budzisko where it will connect with Lithuania’s A5 and intersect with the S8 near Ostrów Mazowiecka. It will also be part of the Via Baltica connecting the Baltic region’s states.

Related Content

  • Budimex consortium win Poland’s Ostroda ringroad court case
    March 18, 2015
    A district court in the Polish town of Olsztyn has ruled in favour of a consortium of Budimex and Ferrovial Agroman which challenged the awarding of a ringroad contract to a rival. The ruling means that the Salini consortium’s winning bid for the construction of a ringroad around Ostroda is overturned on the basis that it was ineffectually low. This means that the contract will go to the Budimex consortium which proposed to build the road for around €223 million. Polish builder Budimex is the consortium's m
  • Slovakia, Salini Impreglio to part ways over D1-Višňové tunnel work
    March 11, 2019
    Slovakia and the Italian-Slovak consortium of Salini Impregilo and Dúha will reportedly end construction of a D1 highway stretch including the Višňové tunnel. The planned 7.5km twin-tube Višňové Tunnel is part of the 13.4km section of the D1 between Lietavská Lúčka and Dubná Skala in northern Slovakia. Work started on what will be Slovakia’s longest tunnel in in June 2015. It is also part of the Corridor 5 of the Trans-European Networks (TEN) which links Bratislava with Uzhhorod in Ukraine and is financed
  • Poland lines up tenders until 2023
    November 7, 2018
    A Polish parliamentary commission has heard that €11.14 billion of road investment within the 2014-23 programme of upgrades has yet to be tendered. This past summer, the government announced that a bridge on the San River near Jarosław will be the first of 22 to be constructed under the Polish government’s Bridges for Regions programme. Central government will fund around 80% or the programme that is expected to cost about €534 million, said Mateusz Morawiecki, the prime minister.
  • Restart for Slovakia’s Čebrať tunnel and Hubova-to-Ivachnova D1 section
    December 13, 2017
    Work will restart on the 15.2km D1 bypass around the Slovakian town of Ružomberok after the government and contractors amended the contract. The consortium of OHL ZS and Vahostav-SK and the National Highway Company (NDS) recently signed and addendum to the contract that includes an extension of section’s Čebrať tunnel by1.6km to 3.6km and shortening of the road by around 300m. Because of continuing geological concern, NDS had earlier decided to reroute the road and the tunnel. As a result, the cost of the