Skip to main content

Romania sets out road programme openings for 2019

Romania will open nearly 44km of new roads in 2019, including parts of the A1 Motorway between Deva and Lugoj. Also to be opened are an 8km stretch between Sebes and Alba Iulia Sud as well as an 18km section of the A3 Motorway between Chetani and Iernut. CNAIR – the National Road Management Infrastructure Company - estimates that drivers will be able to make use of 925km of high-speed motorways in Romania by the end of 2019, around 120km more than at present. Last summer, Romania’s transport minist
January 11, 2019 Read time: 2 mins

Romania will open nearly 44km of new roads in 2019, including parts of the A1 Motorway between Deva and Lugoj.

Also to be opened are an 8km stretch between Sebes and Alba Iulia Sud as well as an 18km section of the A3 Motorway between Chetani and Iernut.

CNAIR – the National Road Management Infrastructure Company - estimates that drivers will be able to make use of 925km of high-speed motorways in Romania by the end of 2019, around 120km more than at present.

Last summer, Romania’s transport ministry said it had cut red tape to speed up 13 road projects. Work was stepped up on around 169km of motorway, including contracts on several projects to complete the A1 motorway – including the section between Lugoj and Deva.

The A1 motorway when finished, will be around 580km and connect the capital Bucharest with the Banat and Crișana regions in the western part of the country. Cities along the route include Pitești, Sibiu, Deva, Timișoara and Arad before reaching the Hungarian M43 motorway near Nădlac.

Related Content

  • East Africa’s dream of a ‘Silk Road’ in sight
    October 22, 2021
    East Africa’s dream of a ‘Silk Road’ route to boost trade and transport is now in sight
  • Zipping up road lanes
    September 28, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra
  • India’s new expressway link
    April 12, 2021
    Accelerated road construction methods are being used to build an expressway link in India, setting records along the way
  • Meva’s Mammut 350 formwork makes the difference for Neckar viaduct
    April 19, 2018
    Formwork specialist Meva is helping replace the longest motorway bridge, the Neckar River viaduct in Germany’s south-west state Baden-Wuerttemberg Work on the 1.3km Neckar viaduct, part of the A6 motorway at Heilbronn, should be finished by 2022. It is part of the A6 expansion project between the Weinberger junction and Wiesloch/Rauenberg. The project is officially the new Neckar viaduct BAB 6 at Heilbronn. Federal Motorway 6, the A6, is also known as the BAB 6. The 477km motorway starts at the French b