Skip to main content

Romania sets out road programme openings for 2019

Romania will open nearly 44km of new roads in 2019, including parts of the A1 Motorway between Deva and Lugoj. Also to be opened are an 8km stretch between Sebes and Alba Iulia Sud as well as an 18km section of the A3 Motorway between Chetani and Iernut. CNAIR – the National Road Management Infrastructure Company - estimates that drivers will be able to make use of 925km of high-speed motorways in Romania by the end of 2019, around 120km more than at present. Last summer, Romania’s transport minist
January 11, 2019 Read time: 2 mins

Romania will open nearly 44km of new roads in 2019, including parts of the A1 Motorway between Deva and Lugoj.

Also to be opened are an 8km stretch between Sebes and Alba Iulia Sud as well as an 18km section of the A3 Motorway between Chetani and Iernut.

CNAIR – the National Road Management Infrastructure Company - estimates that drivers will be able to make use of 925km of high-speed motorways in Romania by the end of 2019, around 120km more than at present.

Last summer, Romania’s transport ministry said it had cut red tape to speed up 13 road projects. Work was stepped up on around 169km of motorway, including contracts on several projects to complete the A1 motorway – including the section between Lugoj and Deva.

The A1 motorway when finished, will be around 580km and connect the capital Bucharest with the Banat and Crișana regions in the western part of the country. Cities along the route include Pitești, Sibiu, Deva, Timișoara and Arad before reaching the Hungarian M43 motorway near Nădlac.

Related Content

  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Nova Scotia sets road budget for 2019-20 at US$224 million
    December 20, 2018
    The Canadian province of Nova Scotia will get US$224 million for road upgrades in 2019-20, a boost of $11.2 million over the current period. Lloyd Hines, the province’s transportation and infrastructure renewal minister, said much of the additional funding will be for twinning portions of the province’s 100 series highways, including the 101, 103, 104 and the 107 Sackville-Burnside connector. The plan includes rebuilding and upgrading gravel roads and around $15 million of the money has been earmarked
  • Get out of my way!
    May 1, 2018
    Paramedics responding to a serious medical emergency in the UK said that they were disgusted when they returned to their ambulance to find a note attached to the windscreen. The note complained that the vehicle had blocked a driveway, preventing a person from moving a car. The paramedics received praise for their efforts in saving the life of someone who had been taken seriously ill, while criticisms were aimed at the selfishness of the unnamed complainant who wrote the note. The writer later admitted his s