Skip to main content

Poland tenders for Czestochowa A1 motorway section

Poland’s General Directorate for National Roads and Motorways (GDDKiA) reports that that the three bids for the Czestochowa A1 motorway section exceed the agency’s budget. The least expensive bid was nearly €101 million, submitted by a consortium of Strabag Infrastruktura Poludnie, Budimex and Budpol. Lemar bid around €121 million while Intercor bid €159 million. GDDKiA said that the bids will not automatically be rejected. Earlier this year GDDKiA terminated its contract with Salini Polska, signed
June 18, 2019 Read time: 2 mins

Poland’s General Directorate for National Roads and Motorways (1361 GDDKiA) reports that that the three bids for the Czestochowa A1 motorway section exceed the agency’s budget.

The least expensive bid was nearly €101 million, submitted by a consortium of Strabag Infrastruktura Poludnie, Budimex and Budpol. Lemar bid around €121 million while Intercor bid €159 million.

GDDKiA said that the bids will not automatically be rejected.

Earlier this year GDDKiA terminated its contract with Salini Polska, signed in late 2015, over construction delay issues. Jan Krynicki, a spokesman for GDDKiA, said at the time of the termination that the agency wanted work to resume as soon as possible with the section open by the end of the year.

The Częstochowa to Blachownia is just over 20km long and is effectively a bypass of Częstochowa.

The 565km A1 - part of the European route E75 - runs north-south in central Poland from Gdańsk on the Baltic Sea through Łódź and the Upper Silesian Industry Area to the Polish-Czech border in Gorzyczki where it connects with the Czech motorway D1.

For more information on companies in this article

Related Content

  • Poland bidders angry over Astaldi win for Warsaw Ring Road work
    June 18, 2015
    Four groups that made bids for building the southern section of the Warsaw Ring Road have filed complaints about how the national road authority GDDKiA chose Astaldi as the winner. Companies appealing to the National Board of Appeal (KIO) are Impresa Pizzarotti, Porr Polska, Salini Polska and IDS-BUD. The offer made by Italian company Astaldi was at least 25% less than the estimated €391 million cost of the project, according to Polish media reports. World Highways reported in February that Astaldi
  • Slovakia, Salini Impreglio to part ways over D1-Višňové tunnel work
    March 11, 2019
    Slovakia and the Italian-Slovak consortium of Salini Impregilo and Dúha will reportedly end construction of a D1 highway stretch including the Višňové tunnel. The planned 7.5km twin-tube Višňové Tunnel is part of the 13.4km section of the D1 between Lietavská Lúčka and Dubná Skala in northern Slovakia. Work started on what will be Slovakia’s longest tunnel in in June 2015. It is also part of the Corridor 5 of the Trans-European Networks (TEN) which links Bratislava with Uzhhorod in Ukraine and is financed
  • Restart for Slovakia’s Čebrať tunnel and Hubova-to-Ivachnova D1 section
    December 13, 2017
    Work will restart on the 15.2km D1 bypass around the Slovakian town of Ružomberok after the government and contractors amended the contract. The consortium of OHL ZS and Vahostav-SK and the National Highway Company (NDS) recently signed and addendum to the contract that includes an extension of section’s Čebrať tunnel by1.6km to 3.6km and shortening of the road by around 300m. Because of continuing geological concern, NDS had earlier decided to reroute the road and the tunnel. As a result, the cost of the
  • Poland plans push-starting project
    February 28, 2012
    In the wake of the difficulties in Poland over the withdrawal of Chinese contractor COVEC from the A2 highway project, the country's government is now looking for a way ahead.