Skip to main content

Poland: GDDKiA calls two S3 dual carriageway construction tenders

Poland’s road authority GDDKiA is going out to tender for construction of a 16km section of the S3 dual carriageway stretching between Bolkow and Kamienna Gora.
June 13, 2017 Read time: 1 min
RSSPoland’s road authority 1361 GDDKiA is going out to tender for construction of a 16km section of the S3 dual carriageway stretching between Bolkow and Kamienna Gora.


Interested parties must submit their offers by the end of July 2017, with the completion of the investment expected to take 50 months.

The GDDKiA is also tendering for construction of another S3 section, around 15km from Kamienna Gora to Lubawka. The winner of the tender will be given 37 months to complete the task.

Two years ago, the goup Przedsiebiorstwo Uslug Technicznych Intercor was awarded a contract to build an 11.6km section of the S3 from Przeszkody to Paszkow at a cost of around €106 million. The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.

For more information on companies in this article

Related Content

  • Poland's highway plans to go ahead
    May 15, 2012
    In Poland, the European Investment Bank has committed itself to maintaining its loan agreement for the A1 highway, despite recent problems over the project. The e1.1 billion loan that the EIB had agreed with Autostrada Poludnie for construction of a 180km section of the A1 highway from Strykow to Pyrzowice, will now be placed at the disposal of the Polish highway authorities. To carry out the work, Poland has to raise a further e503 million, which could be obtained from an issue of road bonds. Autostrada Po
  • Slovakia highway opening faces delays
    March 2, 2017
    A key stretch of the D3 highway in Slovakia will open in the third quarter of 2017. This timescale represents a delay however as the section of road was originally planned to open in the second quarter of 2017. The 4.25km section runs from Zilina Strazov to Zilina Brodno and is costing close to €306 million to construct, with most of the funding being supplied by EU sources. This stretch of the highway is both complex and challenging as it includes a 2.2km section of tunnel as well as bridge over the the Hr
  • Poland eyes PPP for four major highway sections worth €2.32 billion
    June 18, 2018
    Poland will use the public-private partnership model for four road sections worth in total €2.32 billion. The roads are the S6 running from Koszalin to the DK6 at Bozepole Wielkie, the S10 from Bydgoszcz to Torun, the western ring-road of Szczecin and the ring-road around the TriCity metropolis. Tenders will be issued likely by the end of the year or the first quarter 2019, according to Polish media. The decision to adopt the PPP model for infrastructure projects is partly a response to the reduction
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the