Skip to main content

Slovakia highway opening faces delays

A key stretch of the D3 highway in Slovakia will open in the third quarter of 2017. This timescale represents a delay however as the section of road was originally planned to open in the second quarter of 2017. The 4.25km section runs from Zilina Strazov to Zilina Brodno and is costing close to €306 million to construct, with most of the funding being supplied by EU sources. This stretch of the highway is both complex and challenging as it includes a 2.2km section of tunnel as well as bridge over the the Hr
March 2, 2017 Read time: 1 min
RSSA key stretch of the D3 highway in Slovakia will open in the third quarter of 2017. This timescale represents a delay however as the section of road was originally planned to open in the second quarter of 2017. The 4.25km section runs from Zilina Strazov to Zilina Brodno and is costing close to €306 million to construct, with most of the funding being supplied by EU sources. This stretch of the highway is both complex and challenging as it includes a 2.2km section of tunnel as well as bridge over the the Hricovska Dam and Kysuca River. And the consortium building this section of the highway asked for a time extension for the work due to its many challenges. The consortium comprises the contractors 3281 Eurovia, 981 Hochtief and SMS Banska Bystrica.

For more information on companies in this article

Related Content

  • Slovakia looking for more road financing
    June 13, 2017
    The Slovak government is exploring options for road financing after 2020, according to the media.
  • Flyover and tunnel planned for D3 route in Slovakia
    February 13, 2015
    In Slovakia plans are in hand for work to the D3 route that will involve the construction of a flyover, a bridge and a tunnel. The flyover lies on the stretch of D3 between Zilina/Strazov and Zilina/Brodno. Work on this 4.25km section of the D3 is costing close to €255 million. The construction work commenced in June 2014 and is due for completion by 2017. The work is complex and includes building flyover over the Hricovska Prehrada Dam, as well as driving a tunnel and constructing bridge over the Kysuca Ri
  • Slovakian road protests likely over missing D3 sections
    September 1, 2017
    More road blockades are likely after Slovakia’s state motorway company NDS announced it will not tender for missing sections of the D3 motorway this year. Residents of some towns have blocked sections of roads this year urging the government to speed construction of the D3 to help; boost their local economies, according to Slovakian media.
  • Delays to highway, tunnel and bridge building
    May 14, 2012
    The Slovakian government is being asked for financial compensation by Granvia, the group building the country’s new Nitra-Banska Bystrica highway. Granvia is building the highway under the PPP model through a 30-year concession deal. The compensation has been requested due to delays that have been caused by the need for archaeological investigations along the route.