Skip to main content

Budimex wins a 20km section of S61 from Wysokie junction to Raczki

Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
February 16, 2018 Read time: 2 mins

Polish contractor 3302 Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland.

The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced.

Budimex bid just over €484 million for the 29-month design-build contract.

Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • Impressa Pizzarotti signs Polish S61 dual carriageway deal
    June 12, 2017
    Italian infrastructure company Impressa Pizzarotti has signed a deal for work on 24km of Poland’s S61 dual carriageway from Suwalki to the border with Lithuania.
  • Grupo Rubau awarded a section of Poland’s S-61 Expressway project
    February 5, 2018
    Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland. Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.
  • Strabag closes in on Poland’s S8 Marki-Kobylka contract
    August 19, 2019
    Strabag has nudged into the lead for Poland’s retender of the dual lane S8 section between the Marki and Kobylka junctions, previously held by Salini-Impreglio. Five offers were on the table for the deal with Strabag offering €38 million, well above the €32 million that was budgeted for by GDDKiA, Poland’s road authority. Other bids came from a consortium headed by Warszawskie Przedsiebiorstwo Mostowe Mosty at nearly €40 million, a PORR and Unibep consortium offere at almost €59 million, a bid by I
  • 2018 finish for Lithuania’s E 67 Via Baltica Kaunas-Marijampole stretch
    August 23, 2018
    Widening a Lithuanian stretch of the Via Baltica from Kaunas to Marijampole to four lanes should be completed this year, the government said. Transport Minister Rokas Masiulis also said that the highway – also known as the pan-European E 67 - from Marijampole to the Polish border would be reconstructed by 2022. He said safety issues – 42 fatalities in the past 10 years - prompted the widening at a cost of nearly €90 million.