Skip to main content

Budimex wins a 20km section of S61 from Wysokie junction to Raczki

Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
February 16, 2018 Read time: 2 mins

Polish contractor 3302 Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland.

The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced.

Budimex bid just over €484 million for the 29-month design-build contract.

Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • Poland: Rubau Polska makes lowest bid in S61Via Baltica tender
    August 11, 2017
    Poland’s road authority GDDKiA said that five groups have tendered for construction of a 17.5km section of the S61 Expressway. The section runs from Podborze junction to Sniadowo junction and all bids fall within the investor's budget of around €146 million. The lowest offer reportedly was from a Rubau Polska consortium, at around €112 million, while the highest bid was lodged by Budimex at around €139 million.
  • Czech tenders for section of D11, part of the E67 Via Baltica
    July 15, 2016
    The Czech road management company RSD is seeking a contractor for construction of 15km of the D11 motorway between Hradec Kralove and Smirice. Both towns are in northern Czech Republic, near the Polish border. The work is worth around €218.3 million, according to Czech media, and is one of the last remaining sections of the D11 to be built. Construction of another section between the town of Trutnov and the border with Poland is likely to start in 2019 and the Jaromer-Trutnov section after 2020.
  • First part of Hradec-Smirice D11 gets planning permission
    June 12, 2017
    The Czech Transport Ministry has issued a planning permission for the first part of the planned D11 motorway construction for the 15.5km long section Hradec Kralove-Smirice which is expected to cost nearly €247 million.
  • Czech Republic: permit for D11 section moving ahead
    October 25, 2019
    The Czech highway authority has applied for permits to start work on a 41km stretch of the D11 motorway, from Prague to the border with Poland at a cost of around €853 million. Last year a consortium comprising contractors Eurovia, Metrostav and Swietelsky began work on a stretch of the D11 connecting Hradec Kralove and Smirice in the north of the country with completion of the €100.5 million project in 2022. The D11 motorway connecting Prague and Hradec Králové began in 1978. It is part of European r