Skip to main content

Key highway sections to be completed in Serbia in 2017

A series of major highway sections in Serbia should be completed during 2017, including work to two stretches of the key Corridor 10 project. In all, some 122km of highways are expected to be opened to traffic in Serbia during 2017. Greek contractor Actor is building an 18km stretch of Corridor 10 that runs from Surcin to Obrenovac part. This firm is also building a 19.5km section of Corridor 10 from the Ostruznica Bridge that spans the Sava River to Bubanj Potok, and a further 10km section leading to Buban
January 16, 2017 Read time: 2 mins
A series of major highway sections in Serbia should be completed during 2017, including work to two stretches of the key Corridor 10 project. In all, some 122km of highways are expected to be opened to traffic in Serbia during 2017.

Greek contractor Actor is building an 18km stretch of Corridor 10 that runs from Surcin to Obrenovac part. This firm is also building a 19.5km section of Corridor 10 from the Ostruznica Bridge that spans the Sava River to Bubanj Potok, and a further 10km section leading to Bubanj Potok. The Srpska Kuca to Levosoje stretch of highway meanwhile is being built by a group of companies.

Costing €297.4 million, the Belgrade-South Adriatic highway project is being carried out by Chinese contractor Shandong High Speed Group. Funding has been delivered by China's Exim Bank. This is a complex highway project which includes the construction of 12 tunnel stretches as well as 234 bridges.

Related Content

  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh
  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.
  • New road and bridge project for Serbia
    May 7, 2020
    New road and bridge projects are being planned for Serbia.
  • Chinese firms to work on Serbia’s Corridor 11 project
    November 30, 2015
    Serbia and China have signed a memorandum of understanding for construction of two sections of Serbia’s Corridor 11. The MoU was inked in during Serbian Prime Minister Aleksandar Vucic’s visit to the Chinese capital Beijing last week. Serbia’s Tanjug news agency reported that Vucic said the deal was worth around €209 million and included construction of the 18km Surcin-Obrenovac bridge. Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of