Skip to main content

Key highway sections to be completed in Serbia in 2017

A series of major highway sections in Serbia should be completed during 2017, including work to two stretches of the key Corridor 10 project. In all, some 122km of highways are expected to be opened to traffic in Serbia during 2017. Greek contractor Actor is building an 18km stretch of Corridor 10 that runs from Surcin to Obrenovac part. This firm is also building a 19.5km section of Corridor 10 from the Ostruznica Bridge that spans the Sava River to Bubanj Potok, and a further 10km section leading to Buban
January 16, 2017 Read time: 2 mins
A series of major highway sections in Serbia should be completed during 2017, including work to two stretches of the key Corridor 10 project. In all, some 122km of highways are expected to be opened to traffic in Serbia during 2017.

Greek contractor Actor is building an 18km stretch of Corridor 10 that runs from Surcin to Obrenovac part. This firm is also building a 19.5km section of Corridor 10 from the Ostruznica Bridge that spans the Sava River to Bubanj Potok, and a further 10km section leading to Bubanj Potok. The Srpska Kuca to Levosoje stretch of highway meanwhile is being built by a group of companies.

Costing €297.4 million, the Belgrade-South Adriatic highway project is being carried out by Chinese contractor Shandong High Speed Group. Funding has been delivered by China's Exim Bank. This is a complex highway project which includes the construction of 12 tunnel stretches as well as 234 bridges.

Related Content

  • Serbia starts in-depth talks with the Chinese for Corridor 11 work
    May 7, 2015
    Serbia has entered into “in depth” negotiations with two Chinese companies for concession contracts along the Corridor 11 motorway between Belgrade and the Montenegrin border. Shandong High Speed Group and the China Road and Bridge Corporation (CRBC) are the two Chinese companies that have passed the pre-qualification process. The project value has not been mentioned. Serbian vice president Zorana Mihajlovic said that the Chinese have requested guarantees for transport and Serbia is considering this a
  • Serbia in talks with Chinese firms over Corridor 11 completion
    February 12, 2015
    Serbia will enter into talks with two Chinese companies chosen through a tender process that expired this month for restarting construction on the stalled Corridor 11 motorway. Serbian Minister of Construction Zorana Mihajlovic said Shandong Hi-Speed Group and the China Road and Bridge Corporation qualified for tender participation. Work includes construction and maintenance of 17.6km of motorway near Belgrade, between Surcin and Obrenovac as welll as the 31km Preljina-Pozega road and maintenance of t
  • Serbian roads to get Chinese funding
    November 28, 2012
    Talks between the Chinese Development Bank and the Serbian Government could result in €400-€450 million of Chinese funding for Serbian highway projects. The Danube coast and the Corridor 11 projects are among those earmarked for a potential cash boost. Serbia’s Ministry for Transport (MOT) is also in talks with Chinese partners about other highway builds including100km of the Belgrade-Cacak, Belgrade-Obrenovac, Preljina-Ljig and Lajkovac-Ljig routes, as well as the 100km Pojate-Preljina project. China Road
  • Serbia’s road network may benefit from major Chinese investment
    September 27, 2012
    Talks between the Chinese Development Bank and the Serbian Government could result in Chinese funding for Serbian highway projects. The Danube coast project and the Corridor 11 highway project have been identified. Some €400-€450 million of Chinese financing could be made available to Serbia for highway projects following the most recent series of discussions. Serbia’s Ministry for Transport is also in talks with Chinese partners for the construction of a series of highway projects.