Skip to main content

Serbia in talks with Chinese firms over Corridor 11 completion

Serbia will enter into talks with two Chinese companies chosen through a tender process that expired this month for restarting construction on the stalled Corridor 11 motorway. Serbian Minister of Construction Zorana Mihajlovic said Shandong Hi-Speed Group and the China Road and Bridge Corporation qualified for tender participation. Work includes construction and maintenance of 17.6km of motorway near Belgrade, between Surcin and Obrenovac as welll as the 31km Preljina-Pozega road and maintenance of t
February 12, 2015 Read time: 2 mins

Serbia will enter into talks with two Chinese companies chosen through a tender process that expired this month for restarting construction on the stalled Corridor 11 motorway.

Serbian Minister of Construction Zorana Mihajlovic said 3034 Shandong Hi-Speed Group and the 3366 China Road and Bridge Corporation qualified for tender participation.

Work includes construction and maintenance of 17.6km of motorway near Belgrade, between Surcin and Obrenovac as welll as the 31km Preljina-Pozega road and maintenance of the 103km Obrenovac-Preljina road.

The Belgrade-Pozega road will connect Serbia with Montenegro to the west and Romania to the east. China's Exim Bank approved a loan of €295.06 million for construction of the 50km road between Lajkovac and Ljig as well as Obrenovac and U, on Corridor 11.

Part of Corridor 11 was to be built under a concession awarded to the Austrian firm 2859 Alpine and Romanian company 3976 PORR, as well maintenance work for the Novi Sad-Belgrade highway. However, with the collapse of Alpine in mid-2013, the contract had to be renegotiated.

For more information on companies in this article

Related Content

  • Serbia starts in-depth talks with the Chinese for Corridor 11 work
    May 7, 2015
    Serbia has entered into “in depth” negotiations with two Chinese companies for concession contracts along the Corridor 11 motorway between Belgrade and the Montenegrin border. Shandong High Speed Group and the China Road and Bridge Corporation (CRBC) are the two Chinese companies that have passed the pre-qualification process. The project value has not been mentioned. Serbian vice president Zorana Mihajlovic said that the Chinese have requested guarantees for transport and Serbia is considering this a
  • Serbia’s Corridor 11 highway concession
    October 8, 2013
    In Serbia plans are moving forward for the Corridor 11 highway. The contract for the 48km of highway looks set to be carried out under a concession model by Chinese companies. The deal will also involve the 103km Obrenovac-Preljina highway. The cost of the Corridor 11 highway project has not yet been disclosed. A decision has yet to be made regarding the Horgos-Belgrade-Pozega highway. Part of this route was to be built under a concession awarded to Alpine and Porr and this deal included work on some 250km
  • Serbia in talks with Shandong Hi-Speed and China Road and Bridge
    October 22, 2014
    Talks are underway between the Serbian Ministry of Construction, Transport and Infrastructure and two Chinese companies for construction and maintenance the two sections of the Belgrade-Pozega part of the E-763 motorway. The two Chinese companies, Shandong Hi-Speed Group and the China Road and Bridge Corporation (CRBC), are hoping to build the 18km stretch between Surcin and Obrenovac, the 31km between Preljina and Pozega and the 103km between Obrenovac and Preljina. No value of the work has been conf
  • Serbia Corridor 11 motorway works due to begin in March 2013
    January 23, 2013
    Miodrag Jocic, State Secretary from the Serbian Ministry of Construction, , said the Chinese company Shandong High Speed Group (SHSG) will begin construction of Serbia’s new Corridor 11 motorway in March 2013. The Lajkovac-Ljig section of the project is said by Jocic to be completely ready for construction. The overall project value is estimated at US$333 million. Jocic said that the parts between Surcinska Petlja to Obrenovac in Belgrade, and from Preljina to Pozega will be most likely financed with a conc