Skip to main content

Construction to start on Hungary’s revamped M4 project in 2016

The Hungarian government has announced that it will restart work on a new section of the M4 dual carriageway between Albertirsa and Ullo in 2016. Hungarian media reported that the government will invest around €192 million and no funding will come from the European Union, of which the country is a member. The two towns are around 25.5km apart, with Albertirsa closest to the capital Budapest at around 60km. The project should be finished some time in 2019, according to Hungarian media. The announcem
July 7, 2015 Read time: 2 mins
The Hungarian government has announced that it will restart work on a new section of the M4 dual carriageway between Albertirsa and Ullo in 2016.

Hungarian media reported that the government will invest around €192 million and no funding will come from the 1116 European Union, of which the country is a member.

The two towns are around 25.5km apart, with Albertirsa closest to the capital Budapest at around 60km. The project should be finished some time in 2019, according to Hungarian media.

The announcement has breathed life into the stalled and now revamped M4 project that was put on hold earlier this year. The government pulled funding in April after it suspected that price fixing had taken place among contractors.

Reuters news agency reported in April that prime minister Viktor Orban's chief of staff said the competition watchdog GVH was investigating construction of a 29km section of the M4 works.

The week before, Orban's government cancelled the M4 project which had been estimated to have cost around €316 million, citing a lack of available European Union funding.

Winning bidders to construct the M4 motorway project in three parts were 184 Colas Hungaria, 7019 Swietelsky Magyarorszag, 945 Strabag and a consortium of Hungarian companies A-Hid Epito and 3454 Kozgep.

The M4 project is to link the capital Budapest with Romania’s western border city of Oradea.

For more information on companies in this article

Related Content

  • Slovakia, Salini Impreglio to part ways over D1-Višňové tunnel work
    March 11, 2019
    Slovakia and the Italian-Slovak consortium of Salini Impregilo and Dúha will reportedly end construction of a D1 highway stretch including the Višňové tunnel. The planned 7.5km twin-tube Višňové Tunnel is part of the 13.4km section of the D1 between Lietavská Lúčka and Dubná Skala in northern Slovakia. Work started on what will be Slovakia’s longest tunnel in in June 2015. It is also part of the Corridor 5 of the Trans-European Networks (TEN) which links Bratislava with Uzhhorod in Ukraine and is financed
  • Ukraine’s shattered highways
    July 26, 2024
    With no end to its war with Russia in sight, Ukraine is also fighting hard to cope with a growing backlog of major infrastructure projects, especially in terms of rebuilding the country’s roads and bridges. David Arminas reports.
  • Strasbourg bypass surveys halted over environmental concerns
    September 27, 2017
    Further delays are looming for construction of the western Strasbourg bypass, a controversial toll motorway project in north eastern France. The government is concerned about environmental issues after Arcos, the wholly-owned subsidiary of Vinci responsible for building the bypass, said it was going to carry out field surveys in 1.5 hectares of what many consider environmentally sensitive areas.
  • Cost drop for Albania’s Thumana-Kashar motorway?
    August 15, 2019
    Albania’s Thumana-Kashar section of the A1 motorway may cost 50% less than planned, according to a recent feasibility study.