Skip to main content

Construction to start on Hungary’s revamped M4 project in 2016

The Hungarian government has announced that it will restart work on a new section of the M4 dual carriageway between Albertirsa and Ullo in 2016. Hungarian media reported that the government will invest around €192 million and no funding will come from the European Union, of which the country is a member. The two towns are around 25.5km apart, with Albertirsa closest to the capital Budapest at around 60km. The project should be finished some time in 2019, according to Hungarian media. The announcem
July 7, 2015 Read time: 2 mins
The Hungarian government has announced that it will restart work on a new section of the M4 dual carriageway between Albertirsa and Ullo in 2016.

Hungarian media reported that the government will invest around €192 million and no funding will come from the 1116 European Union, of which the country is a member.

The two towns are around 25.5km apart, with Albertirsa closest to the capital Budapest at around 60km. The project should be finished some time in 2019, according to Hungarian media.

The announcement has breathed life into the stalled and now revamped M4 project that was put on hold earlier this year. The government pulled funding in April after it suspected that price fixing had taken place among contractors.

Reuters news agency reported in April that prime minister Viktor Orban's chief of staff said the competition watchdog GVH was investigating construction of a 29km section of the M4 works.

The week before, Orban's government cancelled the M4 project which had been estimated to have cost around €316 million, citing a lack of available European Union funding.

Winning bidders to construct the M4 motorway project in three parts were 184 Colas Hungaria, 7019 Swietelsky Magyarorszag, 945 Strabag and a consortium of Hungarian companies A-Hid Epito and 3454 Kozgep.

The M4 project is to link the capital Budapest with Romania’s western border city of Oradea.

For more information on companies in this article

Related Content

  • Four offers for Sibiu-Pitesti A1 motorway Lot 4 section
    September 4, 2019
    Main Site Taxonomy WH5 Sub Taxonomy ES08 Image supplied No Needs XSP Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway. The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction. The bidders are from China, Turkey, Austria and Italy. Lot
  • EC may seek ‘infringement procedure’ if no Budapest congestion charge by 2015
    December 14, 2012
    The European Commission (EC) has urged authorities in the Hungarian capital Budapest to introduce the congestion charge in the city by 2015 at the latest or face EU legal sanctions, according to some press reports. Should the local authorities fail to take the step, the EC may launch an infringement procedure against Budapest. Thus, the city’s leaders would be obliged to repay EU funds worth €641.6 million (HUF 181bn) provided for building Budapest's Metro 4 underground line. Earlier this year, the Hungaria
  • Polish projects to get Cohesion Fund cash
    March 6, 2018
    Almost €790 million will be allocated from the Cohesion Fund for three road projects which improve the country's communication with Germany and other Western and Eastern European countries. Around €270 million will be for the Garwolin-to-Kurow S17 dual carriageway, another €125 million to build a stretch of the S6 dual carriageway between Goleniow and Kielp and €390 million for the S2 on the outskirts of Warsaw.
  • Norway drops planned fixed link between Moss and Horten
    October 25, 2018
    Norway’s Road Administration has stopped investigations into a proposed bridge or tunnel spanning 10.5km of the Oslofjord between Moss and Horten, according to Norwegian media. The Ministry of Transport has ordered Veivesendet to cancel consultations amid the government’s growing concern over the cost of any fixed link across the narrows, around 65km south of the capital Oslo. The half-hour car-ferry crossing as part of National Highway 19 will continue as usual. Several thousand people and vehicles m