Skip to main content

Consortium to build another Dunajec River crossing near Nowy Sacz

A Polish-Hungarian consortium has signed a €44 million contract to construct a bridge over the Dunajec River near the southern Polish town of Nowy Sacz. Przedsiebiorstwo Wielobranzowe Banimex, from Poland, and Hungarian contractor Hodmezovasarhelyi Utepito Korlatolt Felelossegu will build the bridge within 25 months, according to Polish media reports. Nowy Sącz is at the confluence of the Kamienica and Dunajec rivers , about 20km north of the border with Slovakia and in the Sądecka Valley.
June 14, 2019 Read time: 1 min

A Polish-Hungarian consortium has signed a €44 million contract to construct a bridge over the Dunajec River near the southern Polish town of Nowy Sacz.

Przedsiebiorstwo Wielobranzowe Banimex, from Poland, and Hungarian contractor Hodmezovasarhelyi Utepito Korlatolt Felelossegu will build the bridge within 25 months, according to Polish media reports.

Nowy Sącz is at the confluence of the Kamienica and Dunajec rivers , about 20km north of the border with Slovakia and in the Sądecka Valley.

The new 600m-long 17m-wide crossing will replace a 407m-long 7.5m-wide bridge built near the town of Kurow in 1943.

The old bridge is being replaced reportedly because of its narrow width that congests traffic, as well as because of structural concerns.

Related Content

  • South German road tunnel project to restart
    July 26, 2018
    Construction work on the Kramertunnel in South Germany is to restart. The tunnel is needed to help reduce traffic delays in the town of Garmisch-Partenkirchen in the southern German state of Bavaria and with lies next to the border with Austria. The twin tube tunnel stretches will both be around 2.8km long and the project will also include building six bridges as part of the new bypass around the town. The new bypass, with its tunnel and bridges, is required as traffic jams occur regularly in the town on th
  • Flatiron wins Steveston work in Canada
    April 18, 2022
    The Steveston Interchange project near Vancouver is key for improving traffic flow into what will be a new immersed Massey Tunnel under the Fraser River.
  • New German autobahn bridge under constriuction
    May 1, 2015
    Crane manufacturer Manitowoc has supplied six Potain cranes to German contractor Max Bögl. These machines are being used for constructing a new bridge carrying the A3 autobahn, close to Limburg. Working at over 70m high, the cranes tower over the Lahn Valley. The cranes for this project were supplied by Max Bögl’s subsidiary, Max Bögl Transport & Geräte. The three topless Potain MDT 222 cranes were selected for the work as they feature tip heights of up to 76.2m and can operate with a working radius of
  • New Slovakia-Hungary bridge crossing
    June 7, 2019
    A new bridge connecting Slovakia with Hungary is under construction at present. Costing €117 million, the bridge spans the River Danube connecting Komarno in Slovakia with Komarom in Hungary. The project has been delayed but the bridge should be ready for traffic in 2020. Funding for the project is being provided by the EU and is being directed through the Slovakian Government and the Hungarian Government.