Skip to main content

Consortium to build another Dunajec River crossing near Nowy Sacz

A Polish-Hungarian consortium has signed a €44 million contract to construct a bridge over the Dunajec River near the southern Polish town of Nowy Sacz. Przedsiebiorstwo Wielobranzowe Banimex, from Poland, and Hungarian contractor Hodmezovasarhelyi Utepito Korlatolt Felelossegu will build the bridge within 25 months, according to Polish media reports. Nowy Sącz is at the confluence of the Kamienica and Dunajec rivers , about 20km north of the border with Slovakia and in the Sądecka Valley.
June 14, 2019 Read time: 1 min

A Polish-Hungarian consortium has signed a €44 million contract to construct a bridge over the Dunajec River near the southern Polish town of Nowy Sacz.

Przedsiebiorstwo Wielobranzowe Banimex, from Poland, and Hungarian contractor Hodmezovasarhelyi Utepito Korlatolt Felelossegu will build the bridge within 25 months, according to Polish media reports.

Nowy Sącz is at the confluence of the Kamienica and Dunajec rivers , about 20km north of the border with Slovakia and in the Sądecka Valley.

The new 600m-long 17m-wide crossing will replace a 407m-long 7.5m-wide bridge built near the town of Kurow in 1943.

The old bridge is being replaced reportedly because of its narrow width that congests traffic, as well as because of structural concerns.

Related Content

  • IBT goes roundabout in Bradenton, Florida
    November 26, 2019
    Another roundabout is being built in the US where the public remains sceptical but agencies and contractors are on board, writes David Armina
  • Flyover and tunnel planned for D3 route in Slovakia
    February 13, 2015
    In Slovakia plans are in hand for work to the D3 route that will involve the construction of a flyover, a bridge and a tunnel. The flyover lies on the stretch of D3 between Zilina/Strazov and Zilina/Brodno. Work on this 4.25km section of the D3 is costing close to €255 million. The construction work commenced in June 2014 and is due for completion by 2017. The work is complex and includes building flyover over the Hricovska Prehrada Dam, as well as driving a tunnel and constructing bridge over the Kysuca Ri
  • Montreal’s Champlain Bridge opens but late and over-budget
    June 27, 2019
    Montreal’s US$3.5-billion, 3.4km-long Samuel de Champlain Bridge has opened after four years of construction and months of delays, according to Canadian media reports. Work is continuing on the cycle and pedestrian paths and eventually a light-rail train will run down the middle of the six lane bridge over the St. Lawrence River. The new structure has a life-span of 125 years and runs alongside its namesake Champlain Bridge, a steel truss cantilever that opened in 1962 which will be demolished. Accord
  • New Danube crossing for Serbia
    July 14, 2014
    In Serbia plans are moving ahead with work on the Zezeljev Bridge. The structure will provide a new crossing over the Danube River for the city of Novi Sad. The new bridge replaces an old structure carrying both rail and road links that was destroyed by bombing in 1999. Construction of the new bridge forms part of an EU strategy for the Danube Region. The current cost of the new bridge has not been disclosed although an estimate in 2010 pegged the pricetag at some €60million. The 470m long by 25m wide struc