Skip to main content

Colombia: Bogota-Tunja road project completed

Work on the dual carriageway project between the cities of Bogota and Tunja in the Boyaca region is finished, said Colombia's vice president German Vargas Lleras. The 206km project, costing nearly US$367 million, included construction of a 6km dual carriageway.
January 10, 2017 Read time: 1 min
Work on the dual carriageway project between the cities of Bogota and Tunja in the Boyaca region is finished, said Colombia's vice president German Vargas Lleras.

The 206km project, costing nearly US$367 million, included construction of a 6km dual carriageway.

Related Content

  • Serbia seals the deal for start of Belgrade Corridor 11 ring-road
    July 21, 2016
    Serbian vice president Zorana Mihajlovic has held talks with Li Manchang, China's Ambassador to Serbia in Serbia, for continuation of works on Belgrade’s ring road. According to the political magazine B92, Mihajlovic also signed a memorandum of understanding with Azvirt, the company from Azerbaijan, and China's Sinohidro. Discussions included continuation of work on the Surcin-Obrenovac part of the Corridor 11 motorway. A commercial deal for the project has already been signed with the China Communica
  • Colombia highway construction projects planned
    September 28, 2017
    A series of highway and tunnel projects are planned for Colombia’s Antioquia Department. These new tunnel and highway projects form part of Colombia’s 4G infrastructure development programme. In all 19 tunnel stretches are planned for the eight highways being built in Antioquia as part of the 4G programme. The new highways are providing 28,000 jobs in all and will improve transport connections between Antioquia Department and Colombia’s Atlantic and Pacific coasts.
  • Poland: Intercor wins S3 dual carriageway contract
    April 2, 2015
    Przedsiebiorstwo Uslug Technicznych Intercor has been awarded a contract to build the second section of the S3 dual carriageway. The 11.6km section will stretch from Przeszkody to Paszkow and cost around €106 million (nearly US$116 million). The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.
  • Land acquisition delays the start of Bratislava's orbital road
    September 25, 2017
    Land acquisition issues have stalled the start of construction of Bratislava’s orbital road by up to eight months. Work could begin this autumn, according to a report by the Slovak Spectator, because the government is working on laws that would allow construction before all land is acquired.