Skip to main content

Poland: Intercor wins S3 dual carriageway contract

Przedsiebiorstwo Uslug Technicznych Intercor has been awarded a contract to build the second section of the S3 dual carriageway. The 11.6km section will stretch from Przeszkody to Paszkow and cost around €106 million (nearly US$116 million). The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.
April 2, 2015 Read time: 2 mins
Przedsiebiorstwo Uslug Technicznych Intercor has been awarded a contract to build the second section of the S3 dual carriageway.

The 11.6km section will stretch from Przeszkody to Paszkow and cost around €106 million (nearly US$116 million).

The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.

The total planned length is 470 km, of which 240km is open to traffic, although some stretches are single carriageway.

Motorway A3 was planned to be built along this route before, but the decision was made to build a lower standard so-called express road because traffic was too low to justify an autostrada.

Most express roads in Poland which are built by upgrading existing roads. But some of the S3 is being built on a new alignment away from the parallel DK3 road it is to replace.

Related Content

  • Poland: GDDKiA calls two S3 dual carriageway construction tenders
    June 13, 2017
    Poland’s road authority GDDKiA is going out to tender for construction of a 16km section of the S3 dual carriageway stretching between Bolkow and Kamienna Gora.
  • Polish plans progressing
    October 3, 2014
    Plans are moving forward for a series of key highway projects in Poland. One project involves constructing three sections of the new southern ring road around Polish capital Warsaw. Building the 18.5km stretch that comprises the three sections is expected to cost in the region of €1.6 billion.
  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T