Skip to main content

Cleveland Bridge reports strong activity

Cleveland Bridge UK is reporting strong activity onsite during the pandemic.
By MJ Woof August 5, 2020 Read time: 2 mins
Cleveland Bridge reports strong performance in the first six months of 2020

Cleveland Bridge UK says that it has achieved an increase in onsite activity during the pandemic. The firm reports significant growth for its onsite activity during the first six months of the year, despite the global pandemic. 

The Darlington-based structural steel specialist has seen a 40% jump in business activity during the first half of the year compared to the last six months of 2019. The company has been able to continue to deliver projects during the lockdown period.

Since January, the company has completed steelworks for some major projects. During the lockdown period Cleveland Bridge successfully installed the last of four bridges as part of the £79 million A13 project, which involved widening the road between Orsett and Stanford-le-Hope. The company also completed its work on the Carrington Bridge project, a new road crossing spanning the River Severn in Worcester.

More recently the company fabricated and installed a major new bridge for the Congleton Link Road project.  The 90m-long two-span bridge was required to carry the road over the River Dane.  Comprising six lines of steel girders, forming three braced pairs, the entire steel structure weighed 514tonnes.  All steel components were fabricated from weathering grade steel, which requires no painting or treatment throughout its life.

The increase comes after Cleveland Bridge UK acted quickly to implement new ways of working as a result of the pandemic, including the lockdown period, to enable the continued fabrication and delivery of completed structures to various sites. 

Related Content

  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow
  • Major bridge widening project going to plan
    April 11, 2012
    When built it was determined that a vital US road/rail bridge would always be widened. Work on that huge project is going to plan as Patrick Smith reports One of the biggest bridge widening projects in the world is being carried out under an ambitious development programme. At US$1.2 billion, the seven-year scheme to widen the Huey P. Long Bridge in the US state of Louisiana is also the largest of 16 projects planned under the state's TIMED (Transportation Infrastructure Model for Economic Development)
  • Tees Valley crossing project consultation nears an end
    May 9, 2019
    Public consultation is nearly closed for a possible new crossing across the River Tees in northern England that could cost upwards of €350 million. A €230-290 million Tees Viaduct Capacity Enhancement project is the preferred option against a €350 million Tees Viaduct option, according to the recently created Tees Valley Combined Authority, the local government. Capacity Enhancement project would see a two-lane bridge built parallel to the existing A19 viaduct to carry traffic travelling northbound an