Skip to main content

Cleveland Bridge reports strong activity

Cleveland Bridge UK is reporting strong activity onsite during the pandemic.
By MJ Woof August 5, 2020 Read time: 2 mins
Cleveland Bridge reports strong performance in the first six months of 2020

Cleveland Bridge UK says that it has achieved an increase in onsite activity during the pandemic. The firm reports significant growth for its onsite activity during the first six months of the year, despite the global pandemic. 

The Darlington-based structural steel specialist has seen a 40% jump in business activity during the first half of the year compared to the last six months of 2019. The company has been able to continue to deliver projects during the lockdown period.

Since January, the company has completed steelworks for some major projects. During the lockdown period Cleveland Bridge successfully installed the last of four bridges as part of the £79 million A13 project, which involved widening the road between Orsett and Stanford-le-Hope. The company also completed its work on the Carrington Bridge project, a new road crossing spanning the River Severn in Worcester.

More recently the company fabricated and installed a major new bridge for the Congleton Link Road project.  The 90m-long two-span bridge was required to carry the road over the River Dane.  Comprising six lines of steel girders, forming three braced pairs, the entire steel structure weighed 514tonnes.  All steel components were fabricated from weathering grade steel, which requires no painting or treatment throughout its life.

The increase comes after Cleveland Bridge UK acted quickly to implement new ways of working as a result of the pandemic, including the lockdown period, to enable the continued fabrication and delivery of completed structures to various sites. 

Related Content

  • Framework solutions speed bridge construction
    February 24, 2012
    Framework plays a key role in construction of bridges and other major infrastructure works – Mike Woof writes Speeding construction processes can help reduce costs considerably and the latest formwork solutions can provide significant benefits in this regard. In many projects the use of standardized and modular formwork solutions can play a key role, reducing the planning and systems required for bridge building work.
  • Spencer Group cable access for Pattullo Bridge
    July 3, 2023
    Spencer is working on behalf of Fraser Crossing Constructors GP - a joint venture between Acciona and Aecon - on the suspension bridge near Vancouver, Canada.
  • Peri’s formwork and shoring solution for the “East End Crossing”
    July 6, 2016
    Pylons almost 90m high are a striking feature of a new cable-stayed East End Crossing bridge over the Ohio River in Louisville, Kentucky state in the US The pylons are characterised by their complex shapes and massive legs and cross beams. Peri provided a comprehensive overall concept for its construction – consisting of a planning solution with perfectly matched formwork, climbing, shoring and scaffolding systems along with extensive on-site support. With a Peri solution, the construction crew were a
  • Hill & Smith reports strong financial performance
    November 18, 2016
    Hill & Smith Holdings reports a healthy performance for the period 1 July 2016 to 31 October 2016. The firm’s board says that trading has continued to be encouraging and that it expects Group trading performance for the current financial year to be at the top end of market expectations. The group’s results will also benefit from the positive translational impact on its overseas earnings from the recent weakness in Sterling.