Skip to main content

Astrak gets a grip on road travel for tracked equipment

A first-class paving job should have first class protection with Astrak’s premium rubber pads for steel-tracked equipment. The DuraLine Plus pads are made of abrasion resistant Malaysian rubber suitable for a wide range of machines, said Martyn Pointer, Astrak’s group sales director. Independent test results show that the pads offer more than 25% more durability compared to standard quality rubber pads.
May 15, 2018 Read time: 2 mins
Easy on the eyes and easy on the road: DuraLine Plus pads from Astrak
A first-class paving job should have first class protection with Astrak’s premium rubber pads for steel-tracked equipment.


The DuraLine Plus pads are made of abrasion resistant Malaysian rubber suitable for a wide range of machines, said Martyn Pointer, 8769 Astrak’s group sales director. Independent test results show that the pads offer more than 25% more durability compared to standard quality rubber pads.

The chunky one-pied vulcanised Roadliner version of the pad bolts directly onto the steel track train of machines in the 4-26 tonne range. The pad has an internal steel core specially treated during vulcanisation to ensure a secure bond between rubber and steel. An interlocking design reduces the build-up and clogging of material during operation. Widths range from 400-600mm.

Roadliner pads are secured via four fixed bolts onto the centre of the track chain. Meanwhile, the clip-on version allows a faster attaching process - up to half the time - as well as offering a longer life. The clip-on have a fixed bracket on one side and a secure clamp on the other. Widths range from 400-800mm.

Astrak’s bolt-on version is similar to the clip-on version. It’ four bolts are set wider apart than on the Roadliner version to allow it to fit onto the track shoe instead of the chain. They come in widths between 400-600mm.

For more information on companies in this article

Related Content

  • Smarter paving for Berlin ring road
    December 13, 2018
    Germany’s capital Berlin is now benefiting from a newly widened ring road, which will help reduce peak time congestion Much of the work has been carried out by local contractor Johann Bunte Bauunternehmung, which has helped to widen the Berlin ring road from six to eight lanes. The firm has made extensive use of sophisticated paving controls also on its Vögele machines, the AutoSet Plus automatic functions. And the firm claims that these tools have made the work easier for the paving team to move between t
  • German Autobahn receives new concrete surface
    September 11, 2014
    Precision paving performance has been achieved on a major road project in Germany, using Wirtgen slipform pavers. The SP1500 and SP1500L models have been used to help upgrade a stretch of the BAB A9 Autobahn in Thuringia. The BAB A9 Autobahn is one of Germany’s most important roads, connecting the German cities of Berlin and Munich over a total distance of 529km. The route runs from Brandenburg through Saxony-Anhalt, Saxony, Thuringia and into Bavaria.
  • Hillhead-line acts for 2014 show
    July 2, 2014
    The 2014 edition of Hillhead, the three-day biennial flagship show for the quarrying, recycling and heavy construction industries, is set to welcome thousands of visitors, keen to see the latest leading equipment models alongside innovative machine and site management control technology. Guy Woodford reports on what a variety of major companies will be showcasing during this month’s show at Lafarge Tarmac’s Hillhead Quarry near Buxton in Derbyshire With around 450 UK and international suppliers of plant, eq
  • Stirling Lloyd in the fast lane: Waterproofing Warsaw’s Rowecki Bridge
    January 19, 2016
    Warsaw’s General Stefan Rowecki Bridge, or the Grota Bridge, is the second largest in the Polish capital and, as part of the Trasa Toruska expressway, it is the busiest. The structure, which opened in 1981, handles 150,000 cars daily, so repairs were always going to be tricky if minimal disruption to traffic was to occur. The steel orthotropic deck consists of two structurally independent parts – each with four traffic lanes. This meant that pedestrians and cyclists were restricted to two very narrow track