Skip to main content

German Autobahn receives new concrete surface

Precision paving performance has been achieved on a major road project in Germany, using Wirtgen slipform pavers. The SP1500 and SP1500L models have been used to help upgrade a stretch of the BAB A9 Autobahn in Thuringia. The BAB A9 Autobahn is one of Germany’s most important roads, connecting the German cities of Berlin and Munich over a total distance of 529km. The route runs from Brandenburg through Saxony-Anhalt, Saxony, Thuringia and into Bavaria.
September 11, 2014 Read time: 3 mins
The contracting team has been using two Wirtgen pavers to lay the top and bottom layers, wet on wet

Precision paving performance has been achieved on a major road project in Germany, using 2395 Wirtgen slipform pavers. The SP1500 and SP1500L models have been used to help upgrade a stretch of the BAB A9 Autobahn in Thuringia.

The BAB A9 Autobahn is one of Germany’s most important roads, connecting the German cities of Berlin and Munich over a total distance of 529km. The route runs from Brandenburg through Saxony-Anhalt, Saxony, Thuringia and into Bavaria.

The 19km widening job for the A9 between Triptis and Schleiz was based for the first time in Germany using a new model of public-private partnership, with payment dependent on the quality of service provided. In practice, any defects in quality and any limitation on availability will result in a reduction of the payment to the operator during the 20-year concession.

To meet the lifetime requirements the consortium carrying out the work, 3281 Eurovia, opted to use concrete surfacing, with a finish designed to reduce surface noise. Concrete offers a high resistance to deformation as well as a high load-bearing capacity able to cope with a high percentage of large trucks, while requiring minimal maintenance.

The work required laying the surface for six motorway lanes extending 19km has required some 165,000m3 of concrete. On the A9 job site, the two Wirtgen pavers laid down the two-layer concrete pavement in just one pass at a rate of around 400-500m/day.

The SP1500L paver laid the subgrade. The 230mm-thick bottom-layer concrete was paved true to line and level and compacted by an internal vibrator, while the machine simultaneously embedded dowels and tie bars in it. This yields a homogeneous base for the 70mm-thick top-layer concrete.

The top-layer concrete is installed immediately after the bottom-layer concrete, so as to ensure optimal interlocking of both layers. The concrete for the top-layer is provided via the bottom-layer concrete paver from a receiving hopper with a charging conveyor and placed in front of the second slipform paver, the SP1500.

The machine then distributes this material across the entire paving width with its spreading plough, installs the top-layer concrete wet-in-wet when passing over it and simultaneously compacts it. The finishing beam and super smoother produce the desired optimum surface finish: during the paving process, a finishing beam is deployed across the roadway while an oscillating super smoother operates in the direction of travel of the paver.

The concrete pavement is additionally sprayed with a TCM 1800 curing unit across the entire working width immediately after paving. This prevents rapid evaporation and the formation of cracks.

For more information on companies in this article

Related Content

  • Two German autobahns benefit from new Wirtgen concrete slipforming technology
    November 15, 2013
    Two important routes in Germany, the A9 and A6 autobahn highways, have benefited from the use of the latest Wirtgen slipforming machines. The A9 is a particularly important route in Germany as this 529km link connects capital Berlin with the southern city of Munich, running through Brandenburg, Saxony-Anhalt, Saxony, Thuringia and Bavaria.
  • Concrete paving key to Berlin's airport runways
    February 17, 2012
    High production concrete paving is proving a key feature at the new Berlin airport facility currently under construction The new Berlin-Brandenburg International Airport will soon provide improved links by air to the city. Work started in mid 2006 with the redevelopment of the existing Berlin Schönefeld Airport.
  • Novel concrete paving method used in Germany
    January 25, 2017
    A novel dual-layer concrete paving technique has been used on jobsites in Germany on the country’s high-speed Autobahn network This technique allows the construction of a strong and durable roadway structure able to cope with heavy traffic loads and offer a long working life. In four German states, Wirtgen SP-1500 slipformers have been employed by four different contractors to carry out dual-layer paving. The method allows a noise-reducing, non-skid exposed aggregate surface to be placed over a bottom
  • Concrete paving job for Wirtgen machines in Nigeria
    May 14, 2018
    Concrete paving equipment from Wirtgen has been used to slipform a concrete road surface in south-west Nigeria Anew concrete roadway connects the towns of Itori und Ibese in Nigeria’s Ogun State. The construction work has been carried out by AG-Dangote Construction Company and made use of the sophisticated technology offered by Wirtgen’s SP 500 slipform paver. For this project, the contractor, a joint venture between the Brazilian company Andrade Gutierrez Company and the Dangote Group from Nigeria, rel