Skip to main content

BG pavers offers improved model designs

K firm BG Pavers continues to develop its paver range with the latest generation models now featuring low emission diesels that meet European requirements The new BGP 308 wheeled paver features power from a JCB diesel rated at 63kW and a spokesperson for the firm said, “It’s a good engine for us,” adding that both the fuel consumption and servicing costs are comparatively low. The machine offers a production rate of up to 280tonnes/hour while the screed extends hydraulically from 2-4m, with a maximum 5m pos
October 3, 2014 Read time: 2 mins
BG Pavers offers its BGP 308 wheeled paver with either a tamper bar of vibratory screed

UK firm 2526 BG Pavers continues to develop its paver range with the latest generation models now featuring low emission diesels that meet European requirements

The new BGP 308 wheeled paver features power from a JCB diesel rated at 63kW and a spokesperson for the firm said, “It’s a good engine for us,” adding that both the fuel consumption and servicing costs are comparatively low. The machine offers a production rate of up to 280tonnes/hour while the screed extends hydraulically from 2-4m, with a maximum 5m possible using bolt-on extensions. Weighing in at 8.8tonnes with its V20-40 screed, the machine features a 9.5tonne capacity hopper and is aimed at urban road applications where its mobility and versatility are required. Customers can opt for either a single tamper bar or a vibratory screed as required and the machine offers paving depths of up to 250mm. When paving, the machine operates at speeds of 0-68m/min while it can move at 0-11km/h when moving from one working area to another.

The company has also revised its diminutive C4 model, which can pave depths from 0-130mm and is powered by a Deutz diesel. The V10-25 vibratory screed offers paving widths from 1-2.5m, with the option of 250mm bolt-on extensions for either side to take the width to 3m. Paving speeds range from 0-20m/min while travel speeds are from 0-3.2km/h and this compact machine is designed for use in sites with tight space constraints.

For more information on companies in this article

Related Content

  • Hot-to-hot paving upgrades Bremen City Airport runway
    September 30, 2013
    A new high quality runway surface has been laid at Bremen City Airport. This has provided a much-needed replacement at the airport as the old runway was laid over 20 years ago and was suffering from cracking and potholes. Laying the new surface required the airport to be closed, with the work having to be carried out in a tight time schedule. Contractor Heitkamp Erd- und Straßenbau was brought in to carry out the work as the firm had experience in runway rehabilitation projects having carried out pavemen
  • Sophisticated milling system from Wirtgen
    January 29, 2014
    Wirtgen is now offering a novel cold milling concept in the shape of its innovative W 200 Hi model. This large milling machine features a hydraulically driven milling drum assembly that can be displaced 400mm to both the right and the left, ensuring maximum versatility on the job. This machine has been developed to meet the needs of contractors having to work in the confined conditions encountered in urban traffic and on highway sites with flowing traffic. The moveable drum allows this large planer to carry
  • Developments in road stabilisation machines
    February 14, 2012
    Road stabilisers play an important role for road recycling, with new machines coming to market - Mike Woof writes The reclaimer/stabiliser is becoming a much more important machine in roadbuilding applications now that the construction market is increasing its use of road recycling. The reclaimer/stabiliser used to be a niche machine offered by specialist manufacturers such as CMI, which was a pioneer of the concept. However in recent years this type of machine has become an important construction tool,
  • Smoother highway achieved in Florida
    June 16, 2016
    The busy I-10 in Florida is now benefiting from a smoother surface, following very necessary reconstruction work. There were no completed sections of I-10 until 1961 when the 59km Sanderson to Jacksonville stretch was first finished. In the years since, section by section have been constructed, culminating in the complete stretch of I-10 in Florida, running 579km through the state. The interstate stretches west well beyond the Florida border making I-10 one of three coast-to-coast interstates, along with