Skip to main content

Faroes’ Streymoy-to-Sandoy Tunnel opens

The 10.8km-long Sandoy Tunnel connecting the islands of Streymoy and Sandoy opened in mid-December and is the longest subsea tunnel in the Faroe Islands.
By David Arminas January 23, 2024 Read time: 2 mins
The Sandoy Tunnel crosses the Skopunarfjørður – the strait between Sandoy and Streymoy islands – connecting the port of Gamlarætt on Streymoy to Traðardalur in central Sandoy, south of Streymoy Island (image couirtesy NCC)

Drivers in the Faroe Islands were using the recently opened Sandoy Tunnel for free for the first 23 days of operation.

The 10.8km-long tunnel connecting the islands of Streymoy and Sandoy opened in mid-December and is the longest subsea tunnel in the Faroe Islands and one of the longest in the world, according to the island group’s ministry of transport. The contractor, Swedish infra group NCC, notes that the tunnel is 9.5m wide and has a lowest point at 147m with a gradient of 5%,

The Sandoy Tunnel crosses the Skopunarfjørður – the strait between Sandoy and Streymoy islands – connecting the port of Gamlarætt on Streymoy to Traðardalur in central Sandoy, south of Streymoy Island. Ferry service between Gamlarætt on Streymoy and Skopun on Sandoy has now been cancelled.

Construction began on both sides of the project in June 2019 and the two teams met in February 2022. The cost of Sandoyartunnilin has been around US$127 million.

"The tunnel offers the best of both worlds,” said the Faroe Island prime minister Aksel Johannesen during the opening ceremony. “Access to the vibrancy of city life and the tranquillity of small village communities.”

Some financing for construction and operation of the Sandoy Tunnel will come from toll revenue from the 11.4km-long Eysturoyartunnilin that opened in December 2019. It links Streymoy and Eysturoy islands and has 10 times the estimated traffic that is likely to use Sandoy Tunnel.

The Faroes government tunnel operator P/F Tunnil has estimated that 300–400 vehicles per day will use the Sandoy Tunnel. Average daily ridership of the ferry route was 195 vehicles.

Meanwhile, work continues by the Czech construction firm Metrostav on a 1.2km tunnel on Suðuroy Island to connect the villages of Fámjin and Ørðavík. Less than 90 people live in the area but the road connection has been poor and often closed during bad weather.

For more information on companies in this article

Related Content

  • More financial doubt over proposed Fehmarn Belt Tunnel
    March 17, 2017
    The proposed Fehmarn Belt Tunnel to link Denmark and northern Germany will never be economically viable, according a report commissioned by German ferry operator Scandilines. Revenue and traffic forecasts are unrealistically high, notes the report completed by German consultancy DIW Econ. It is unlikely that the latest cost to build the massive road tunnel, around €7.4 billion, would ever be recovered. The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. Cur
  • COWI wins Massey Tunnel design contract
    February 18, 2022
    COWI will develop an eight-lane immersed tunnel for the George Massey Crossing Project near Vancouver, Canada.
  • Polish tunnel project being planned
    January 21, 2019
    Construction work on the planned tunnel for the Polish islands of Uznam and Wolin will commence in 2021. The islands lie on Poland’s Baltic Coast and this €184 million tunnel project is intended to improve transport connections in the area. The ferries used at present are ageing and are no longer able to cope adequately with the number of vehicles using the crossing. Up to 11,000 vehicles/day make the crossing during peak summer months, with around 2 million vehicles/year making the trip by ferry at present
  • Danish-German Fehmarn Belt road and rail tunnel hits funding snag
    July 9, 2015
    A Danish newspaper has learned of a significant European Union funding gap for one of Europe’s most ambitious transportation road and rail projects. The Fehmarn Belt Fixed Link would connect the German island of Fehmarn with the Danish island of Lolland. A submersed tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea. Last February news emerged that contractors had revamped their cost estimates, adding nearly €1.2 billion to the project. This put the final cost of the 18