Skip to main content

Pexco’s lays down a marker with its City Post Glue Down channaliser

Pexco says it has raised the bar for high-performance channeliser posts with the introduction of its City Post model GD Glue Down. City Post GD - the latest addition to the City Post family - features the same sleek profile, polyurethane construction and quick, sharp, impact rebound.The pinwheel design of the base enhances post retention, says Pexco. The City Post GD Glue Down’s exceptional performance was recently proven by the Texas A&M Transportation Institute in a test sponsored by the Florida Departmen
April 18, 2017 Read time: 2 mins
Pexco says it has raised the bar for high-performance channeliser posts with the introduction of its City Post model GD Glue Down


City Post GD - the latest addition to the City Post family - features the same sleek profile, polyurethane construction and quick, sharp, impact rebound.The pinwheel design of the base enhances post retention, says 301 Pexco. The City Post GD Glue Down’s exceptional performance was recently proven by the Texas A&M Transportation Institute in a test sponsored by the 2697 Florida Department of Transportation.

The testing institute’s independent testing sought to establish new minimum standards for managed lane applications. Pexco said that this state-level DOT-sponsored event was the first head-to-head testing ever at an accredited third party test facility to determine the highest performing posts on the market.

Of the seven products tested from four different manufacturers, Pexco’s City Posts emerged as the top performers, with the new City Post GD testing 222% higher than the minimum impact standard recommended by researchers. All posts survived well over 100 impacts at 112kph. The one-piece construction posts need no drilling and thanks to their self-adhesive quality they can be glued down on both concrete and asphalt. One-piece construction means no assembly is required and there are also no springs to fail.

Pexco’s Davidson Traffic Product Division manufactures the City Post GD in the US. It also makes other systems, including kerb system lane separators, Type I, II and III barricades, reflectors for barrier walls, snow poles and many more, some of which are self-adhering.

Pexco is based near Atlanta in the state of Georgia. Last October it opened a facility called Extrusion and Engineering Center of Excellence at its Philadelphia facility.

The centre offers engineering consultation and design services for companies that require custom-extruded products or components. The facility focuses on the industrial market, including the lighting, filtration and traffic safety sectors.

For more information on companies in this article

Related Content

  • Smoother highway achieved in Florida
    June 16, 2016
    The busy I-10 in Florida is now benefiting from a smoother surface, following very necessary reconstruction work. There were no completed sections of I-10 until 1961 when the 59km Sanderson to Jacksonville stretch was first finished. In the years since, section by section have been constructed, culminating in the complete stretch of I-10 in Florida, running 579km through the state. The interstate stretches west well beyond the Florida border making I-10 one of three coast-to-coast interstates, along with
  • Directive on road infrastructure safety management – to improve mobility safely
    September 12, 2018
    Better signs and more compliance leads to safer roads, says Christophe Nicodème, director general of the European Union Road Federation in the first of a regular new series of columns from ERF The Third Mobility Package launched by the European Commission represents the final piece of the “Europe on the Move Agenda” towards a modernisation of transport policy adapting to new decarbonisation and digitisation commitments. The package is composed of elements impacting various transport elements, among which
  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk