Skip to main content

Pexco’s lays down a marker with its City Post Glue Down channaliser

Pexco says it has raised the bar for high-performance channeliser posts with the introduction of its City Post model GD Glue Down. City Post GD - the latest addition to the City Post family - features the same sleek profile, polyurethane construction and quick, sharp, impact rebound.The pinwheel design of the base enhances post retention, says Pexco. The City Post GD Glue Down’s exceptional performance was recently proven by the Texas A&M Transportation Institute in a test sponsored by the Florida Departmen
April 18, 2017 Read time: 2 mins
Pexco says it has raised the bar for high-performance channeliser posts with the introduction of its City Post model GD Glue Down


City Post GD - the latest addition to the City Post family - features the same sleek profile, polyurethane construction and quick, sharp, impact rebound.The pinwheel design of the base enhances post retention, says 301 Pexco. The City Post GD Glue Down’s exceptional performance was recently proven by the Texas A&M Transportation Institute in a test sponsored by the 2697 Florida Department of Transportation.

The testing institute’s independent testing sought to establish new minimum standards for managed lane applications. Pexco said that this state-level DOT-sponsored event was the first head-to-head testing ever at an accredited third party test facility to determine the highest performing posts on the market.

Of the seven products tested from four different manufacturers, Pexco’s City Posts emerged as the top performers, with the new City Post GD testing 222% higher than the minimum impact standard recommended by researchers. All posts survived well over 100 impacts at 112kph. The one-piece construction posts need no drilling and thanks to their self-adhesive quality they can be glued down on both concrete and asphalt. One-piece construction means no assembly is required and there are also no springs to fail.

Pexco’s Davidson Traffic Product Division manufactures the City Post GD in the US. It also makes other systems, including kerb system lane separators, Type I, II and III barricades, reflectors for barrier walls, snow poles and many more, some of which are self-adhering.

Pexco is based near Atlanta in the state of Georgia. Last October it opened a facility called Extrusion and Engineering Center of Excellence at its Philadelphia facility.

The centre offers engineering consultation and design services for companies that require custom-extruded products or components. The facility focuses on the industrial market, including the lighting, filtration and traffic safety sectors.

For more information on companies in this article

Related Content

  • Degaroute skipline markings
    May 6, 2016
    Of the 8,050km of tollway roads in the United States, the Illinois State Toll Highway Authority manages 460km of them As part of the maintenance programme for this network of five highways, the Illinois State Toll Highway Authority has partnered with Applied Research Associates to manage and monitor the performance of all their pavement marking programmes, providing recommendations for striping projects.
  • Florida gets one.network closure
    November 14, 2022
    Road crews in the US state of Florida can now post lane closure information to GPS providers from their mobile phones while working on site
  • Barriers to safety
    April 1, 2021
    All vehicle restraint devices on European roads are – or should be - certified according to the European impact standard EN 1317, implying conformity. But it doesn’t necessarily ensure that the crash barrier will perform its main aim of saving the vehicle occupants’ lives.
  • U.S National Guard’s airport upgrade
    October 12, 2012
    In Kansas, specialist contractor Pavers has carried out important work for the National Guard. The aim of the work was to rehabilitate a WWII era hangar apron for the Kansas National Guard. The project required extensive repair work, including pavement patching, dowel bar retrofitting, partial depth patching and joint sealing. Pavers had to overhaul a 305m x 91.5m apron at Army Aviation Support Facility No 2 that suffered from poor drainage. The project included milling 152mm of old asphalt and concrete and