Skip to main content

Bridging Brunei with a PmB structural waterproofing system

Pitchmastic PmB is wrapping up its bridge-deck waterproofing work on South East Asia’s longest over-sea crossing, the 30km Temburong Bridge in Brunei.
November 29, 2019 Read time: 2 mins
PmB has it covered on the US$1.2 billion Temburong Bridge project in Brunei, on the island of Borneo

Pitchmastic PmB is wrapping up its bridge-deck waterproofing work on South East Asia’s longest over-sea crossing, the 30km Temburong Bridge in Brunei.

PmB’s work started in April on the US$1.2 billion Temburong Bridge that will, when finished, connect Mengkubau and Sungai Besar in Brunei-Muara District and Labu Estate in the exclave Temburong District. Residents of Temburong will no longer have to travel through Malaysia and the local government hopes the bridge will also boost eco-tourism in the area.

The Temburong Bridge contract is the largest bridgedeck waterproofing project ever undertaken by the USL Group, parent company of Pitchmastic PmB International. It required a weekly output of around 10,000m² of the completed PmB system.

PmB protects the reinforced concrete from the effects of water and airborne contamination that would otherwise lead to corrosion and deterioration of the structure. Asphalt is easily laid on top of the PmB system.

Pitchmastic PmB International has many projects in South East Asia as well as the Middle East, including the RA214 Doha Link project - part of the strategically important Sheikh Al Jaber Ahmad Causeway in Kuwait. The project spans nearly13km from Doha to Shuwaikh and involves the supply and installation of 280,000m² of PmB. Multiple teams of Pitchmastic worked alongside highly skilled local support from the project’s main contractor, Korean giant GS Engineering and Construction.

Related Content

  • Kuwait mega-project due to start
    May 25, 2012
    South Korean firm Hyundai Engineering and Construction looks to have won the deal to build a massive causeway project in Kuwait. The firm offered a bid of US$2.6 billion. The causeway will be named after the late emir Shaikh Jaber al-Ahmad al Sabah. This 25km causeway will connect Kuwait’s northern Subbiya area with Kuwait City.
  • Working in tandem
    August 16, 2018
    A tandem crane lift has been carried out in Kuwait on a major project in using Demag machines from Terex. The two machines have been used on the Kuwaiti government's Sheikh Jaber Al Ahmad Al Sabah Causeway Project. This 36km-long road connection is among the world's largest infrastructure projects underway at present. The project includes a 27km-long bridge over Kuwait Bay. The Kuwaiti logistics service provider Integrated Logistics Company (ILC) is carrying out key sections of the project, moving pre-a
  • China Harbor Engineering picks up Brunei’s Muara Besar project
    May 11, 2015
    Brunei has awarded Chinese infrastructure construction company China Harbor Engineering Company (CHEC) the US$204 million Pulau Muara Besar Bridge, Road and Utilities project through an open tender. CHEC reportedly signed the deal with the Brunei Economic Development Board on May 6, according to Chinese media. Pulau Muara Besar is a 955ha island in Brunei Bay, immediately across from Brunei’s largest port town, Muara, on the mainland. The island is undergoing major infrastructure development including
  • Korean company carrying out Kuwait bridge contract
    October 31, 2014
    The Kuwaiti Government has awarded a US$520 million bridge construction contract to South Korean construction firm GS E&C. The deal will see GS E&C building a 12.43km bridge that features eight lanes. The central 7.72km section of the bridge will be constructed over water, in Al Asimah Governorate. The Doha Link Bridge will connect Entertainment City with Shuwaikh Port and is due for completion 36 months from now.