Skip to main content

Bridging Brunei with a PmB structural waterproofing system

Pitchmastic PmB is wrapping up its bridge-deck waterproofing work on South East Asia’s longest over-sea crossing, the 30km Temburong Bridge in Brunei.
November 29, 2019 Read time: 2 mins
PmB has it covered on the US$1.2 billion Temburong Bridge project in Brunei, on the island of Borneo

Pitchmastic PmB is wrapping up its bridge-deck waterproofing work on South East Asia’s longest over-sea crossing, the 30km Temburong Bridge in Brunei.

PmB’s work started in April on the US$1.2 billion Temburong Bridge that will, when finished, connect Mengkubau and Sungai Besar in Brunei-Muara District and Labu Estate in the exclave Temburong District. Residents of Temburong will no longer have to travel through Malaysia and the local government hopes the bridge will also boost eco-tourism in the area.

The Temburong Bridge contract is the largest bridgedeck waterproofing project ever undertaken by the USL Group, parent company of Pitchmastic PmB International. It required a weekly output of around 10,000m² of the completed PmB system.

PmB protects the reinforced concrete from the effects of water and airborne contamination that would otherwise lead to corrosion and deterioration of the structure. Asphalt is easily laid on top of the PmB system.

Pitchmastic PmB International has many projects in South East Asia as well as the Middle East, including the RA214 Doha Link project - part of the strategically important Sheikh Al Jaber Ahmad Causeway in Kuwait. The project spans nearly13km from Doha to Shuwaikh and involves the supply and installation of 280,000m² of PmB. Multiple teams of Pitchmastic worked alongside highly skilled local support from the project’s main contractor, Korean giant GS Engineering and Construction.

Related Content

  • Diamond in the Pearl: China’s Hong Kong-Zhuhai-Macao Bridge complex
    March 8, 2018
    People in the Pearl River Delta are celebrating the Chinese New Year with the imminent opening of the Hong Kong-Zhuhai-Macao Bridge. David Arminas reviews progress. China’s Spring Festival, or Lunar New Year, is celebrated with the usual enthusiasm and spectacular fireworks. But celebrations will be particularly joyous for many people in the southern Pearl River Delta. The soon-to-be-open Hong Kong-Zhuhai-Macao Bridge (HZMB) will slash travel time between the Hong Kong Special Administrative Region, Zhuh
  • Kuwait’s massive infrastructure plan
    December 12, 2022
    Kuwait is revealing details of its massive infrastructure plan.
  • Kuwait spending on infrastructure development
    August 30, 2019
    Kuwait is boosting its spending on infrastructure development works in the Al-Mutlaa area.
  • Steel sealed on Stonecutters Bridge
    February 6, 2012
    The stone mastic asphalt surface being laid on the bridge deck. The Stonecutters Bridge in Hong Kong, the second longest spanning cable stayed bridge in the world, is a dual three-lane crossing of the Rambler Channel. It utilises 33,500tonnes of structural steel in the bridge deck; 32,000m3 of concrete in the towers and 65 steel deck units relying on 224 cables. Effectively protecting the megastructure's deck from the weather extremes (monsoon rains and extreme heat in the summer) and the high levels of tra