Skip to main content

Bridging Brunei with a PmB structural waterproofing system

Pitchmastic PmB is wrapping up its bridge-deck waterproofing work on South East Asia’s longest over-sea crossing, the 30km Temburong Bridge in Brunei.
November 29, 2019 Read time: 2 mins
PmB has it covered on the US$1.2 billion Temburong Bridge project in Brunei, on the island of Borneo

Pitchmastic PmB is wrapping up its bridge-deck waterproofing work on South East Asia’s longest over-sea crossing, the 30km Temburong Bridge in Brunei.

PmB’s work started in April on the US$1.2 billion Temburong Bridge that will, when finished, connect Mengkubau and Sungai Besar in Brunei-Muara District and Labu Estate in the exclave Temburong District. Residents of Temburong will no longer have to travel through Malaysia and the local government hopes the bridge will also boost eco-tourism in the area.

The Temburong Bridge contract is the largest bridgedeck waterproofing project ever undertaken by the USL Group, parent company of Pitchmastic PmB International. It required a weekly output of around 10,000m² of the completed PmB system.

PmB protects the reinforced concrete from the effects of water and airborne contamination that would otherwise lead to corrosion and deterioration of the structure. Asphalt is easily laid on top of the PmB system.

Pitchmastic PmB International has many projects in South East Asia as well as the Middle East, including the RA214 Doha Link project - part of the strategically important Sheikh Al Jaber Ahmad Causeway in Kuwait. The project spans nearly13km from Doha to Shuwaikh and involves the supply and installation of 280,000m² of PmB. Multiple teams of Pitchmastic worked alongside highly skilled local support from the project’s main contractor, Korean giant GS Engineering and Construction.

Related Content

  • Brunei bridge being built
    August 4, 2017
    Work is progressing on the major Temburong Bridge project in Brunei. This bridge will measure nearly 12km in length, with the work being handled by a series of contractors. Both the Chinese contractor China State Construction Engineering Corporation Limited (CSCEC) and the South Korean firm Daelim Industrial are involved in the project. Work being carried out also includes the construction of two viaducts measuring 13.4km. The link is expected to open to traffic in 2019.
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • Brunie bridge building bids
    April 30, 2015
    Four Chinese contractors are involved in the bidding process for work on Brunei’s Temburong Bridge project. This is the second phase for the bridge project, as a local contractor, Swee, and a South Korean company, Daelim Industrial, won the tender process for the first phase of the work. There are five phases in all for the 30km Temburong Bridge project. In all the project is expected to cost some US$1.21 billion to construct. The names of all of the bidders for the second phase have not so far been release