Skip to main content

Bridging Brunei with a PmB structural waterproofing system

Pitchmastic PmB is wrapping up its bridge-deck waterproofing work on South East Asia’s longest over-sea crossing, the 30km Temburong Bridge in Brunei.
November 29, 2019 Read time: 2 mins
PmB has it covered on the US$1.2 billion Temburong Bridge project in Brunei, on the island of Borneo

Pitchmastic PmB is wrapping up its bridge-deck waterproofing work on South East Asia’s longest over-sea crossing, the 30km Temburong Bridge in Brunei.

PmB’s work started in April on the US$1.2 billion Temburong Bridge that will, when finished, connect Mengkubau and Sungai Besar in Brunei-Muara District and Labu Estate in the exclave Temburong District. Residents of Temburong will no longer have to travel through Malaysia and the local government hopes the bridge will also boost eco-tourism in the area.

The Temburong Bridge contract is the largest bridgedeck waterproofing project ever undertaken by the USL Group, parent company of Pitchmastic PmB International. It required a weekly output of around 10,000m² of the completed PmB system.

PmB protects the reinforced concrete from the effects of water and airborne contamination that would otherwise lead to corrosion and deterioration of the structure. Asphalt is easily laid on top of the PmB system.

Pitchmastic PmB International has many projects in South East Asia as well as the Middle East, including the RA214 Doha Link project - part of the strategically important Sheikh Al Jaber Ahmad Causeway in Kuwait. The project spans nearly13km from Doha to Shuwaikh and involves the supply and installation of 280,000m² of PmB. Multiple teams of Pitchmastic worked alongside highly skilled local support from the project’s main contractor, Korean giant GS Engineering and Construction.

Related Content

  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642
  • The power of water
    July 18, 2012
    The popularity of hydrodemolition is growing worldwide and was the specified solution for work on two vital Swedish links The hydrodemolition technique, which uses high pressure water jets to remove damaged concrete from various structures, is playing a crucial role in the major restoration of the vital Central Bridge and Söderled Tunnel in the centre of Sweden's capital Stockholm. The 1,550m dual two-lane rectangular box Söderled Tunnel and connecting dual two and three-lane Central Bridge are a vital 2.6k
  • New bridges, ramp and tunnel for Dubai
    February 19, 2020
    New flyover bridges, a ramp and a tunnel connection are being built in Dubai.
  • Washington DC’s historic bridge replacement project
    June 11, 2019
    The project to replace a historic bridge in US capital Washington DC is providing major challenges for its builders - Mike Woof writes