Skip to main content

Upgrade set to start of Budapest’s Széchenyi Chain Bridge

Budapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media. Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019. The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow B
April 4, 2017 Read time: 2 mins
RSSBudapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media.

Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019.

The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow Bridge, across the River Thames in Marlow, near London. Its 202m centre span was one of the longest in the world when bridge was opened.

It was designed in sections and shipped from the United Kingdom for assemble in Budapest. The two-lane deck is nearly 15m wide and the iron chains on which the road-deck hangs are supported by two 48m river piers in classicist style. The bridge was rebuilt in the late 1940s after being blown up by the retreating German army in early 1945.

Related Content

  • US$73 million Francis Scott Bridge replacement contract
    September 3, 2024
    Kiewit has been awarded a US$73 million Francis Scott Bridge replacement contract.
  • McCloskey continues to grow
    January 6, 2017
    Screening and crushing machine manufacturer McCloskey increased its workforce by 30% and added some 12,600m2 of covered workspace in 2012. At the Peterborough facility in Canada, the company has added almost 4,000m2 of warehousing and another 7,250m2 to extend the production line.
  • McCloskey continues to grow
    April 18, 2013
    Screening and crushing machine manufacturer McCloskey increased its workforce by 30% and added some 12,600m2 of covered workspace in 2012. At the Peterborough facility in Canada, the company has added almost 4,000m2 of warehousing and another 7,250m2 to extend the production line.
  • Crossrail trains to start running in 2017
    April 25, 2012
    The opening of Crossrail, the new east-west rail line in London, has been set for May 2017. Trains will initially be able to use the north east section of the new line, between Liverpool Street and Shenfield in Essex, Crossrail’s chief executive Andrew Worstenholme told a meeting of the London Assembly transport committee. The western surface section between Paddington and Heathrow should start in 2018, with a trial also beginning in December that year in the central tunnel section linking Paddington and