Skip to main content

Upgrade set to start of Budapest’s Széchenyi Chain Bridge

Budapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media. Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019. The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow B
April 4, 2017 Read time: 2 mins
RSSBudapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media.

Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019.

The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow Bridge, across the River Thames in Marlow, near London. Its 202m centre span was one of the longest in the world when bridge was opened.

It was designed in sections and shipped from the United Kingdom for assemble in Budapest. The two-lane deck is nearly 15m wide and the iron chains on which the road-deck hangs are supported by two 48m river piers in classicist style. The bridge was rebuilt in the late 1940s after being blown up by the retreating German army in early 1945.

Related Content

  • German highway contract for STRABAG
    August 10, 2021
    A major German highway contract will be worked on by STRABAG.
  • US$1.7 billion Francis Scott Key Bridge replacement design
    February 6, 2025
    The design of the US$1.7 billion Francis Scott Key Bridge replacement is revealed.
  • Tecnoidea’s high-beam design eases filter changes
    January 6, 2017
    Tecnoidea has introduced a plate press filtration plant with high-beam design, which is capable of working at pressures up to 16bar and said to speed the location of and replacement of breached filters. The modular design can have up to 100 pairs of filters to cope with flows up to 9,000lit/min and each pair has an individual drain, making it easier to locate breached filters. For ease and speed of replacing breached filter material, the high-beam design incorporates a handling system to remove the relevant
  • Tecnoidea’s high-beam design eases filter changes
    April 17, 2013
    Tecnoidea has introduced a plate press filtration plant with high-beam design, which is capable of working at pressures up to 16bar and said to speed the location of and replacement of breached filters. The modular design can have up to 100 pairs of filters to cope with flows up to 9,000lit/min and each pair has an individual drain, making it easier to locate breached filters. For ease and speed of replacing breached filter material, the high-beam design incorporates a handling system to remove the relevant