Skip to main content

Crossrail trains to start running in 2017

The opening of Crossrail, the new east-west rail line in London, has been set for May 2017. Trains will initially be able to use the north east section of the new line, between Liverpool Street and Shenfield in Essex, Crossrail’s chief executive Andrew Worstenholme told a meeting of the London Assembly transport committee. The western surface section between Paddington and Heathrow should start in 2018, with a trial also beginning in December that year in the central tunnel section linking Paddington and
April 25, 2012 Read time: 1 min
The opening of 4115 Crossrail, the new east-west rail line in London, has been set for May 2017.

Trains will initially be able to use the north east section of the new line, between Liverpool Street and Shenfield in Essex, Crossrail’s chief executive Andrew Worstenholme told a meeting of the London Assembly transport committee.

The western surface section between Paddington and Heathrow should start in 2018, with a trial also beginning in December that year in the central tunnel section linking Paddington and Abbey Wood.

Paddington to Shenfield services should begin in May 2019, so that a full service is operating by December 2019. Liverpool Street to Shenfield services are to transfer to Crossrail from Greater Anglia in April 2015.

For more information on companies in this article

Related Content

  • Douglas Parkes: tunnelling pioneer obituary
    June 30, 2025
    Douglas Parkes, a pioneer of modern tunnelling technology, died recently.
  • Lower traffic emissions in London
    May 20, 2019
    London’s ultra-low emission zone (ULEZ) system is already proving successful. In the first month since the scheme was introduced, the number of non-compliant vehicles entering the charging zone has been reduced by 9,400/day, a drop of 26%. According to the latest research, 74% of vehicles entering the ULEZ have been in compliance with the emission requirements.
  • Boost to infrastructure, autonomous cars in UK budget
    March 17, 2016
    The UK chancellor announced in his spring budget what he called the biggest investment, US$87.5 billion (£61 billion), in transport infrastructure in generations and is increasing capital investment in the transport network by 50 per cent over this Parliament compared to the last. The government plans to establish the UK as a global centre for excellence in connected and autonomous vehicles by establishing a US$24.1 million (£15 million) ‘connected corridor’ from London to Dover to enable vehicles to com
  • Bitumen technology reduces maintenance costs
    April 12, 2023
    Looming net zero deadlines, and impetus from the private sector are accelerating the take up of carbon-saving technologies