Skip to main content

Strong interest in building new Chile-Argentina tunnel link

Interest is strong in the proposed tunnel linking Chile and Argentina. Some 37 companies have shown expressions of interest in the US$1 billion Agua Negra road tunnel. This includes 22 consortia and includes Latin American firms such as Panedile, Techint, Camargo Correa, Jose Cartellone. It also includes the Chinese firms China Railway Construction Corporation, China Railway Bureau Group, China State Construction Engineering Corporation and Sinohydro Group. Daewoo, Hyundai Engineering and SK Eng & Construct
October 30, 2013 Read time: 2 mins
Interest is strong in the proposed tunnel linking Chile and Argentina. Some 37 companies have shown expressions of interest in the US$1 billion Agua Negra road tunnel. This includes 22 consortia and includes Latin American firms such as 2429 Panedile, Techint, Camargo Correa, 1390 Jose Cartellone. It also includes the Chinese firms 6590 China Railway Construction Corporation, 890 China Railway Bureau Group, 5711 China State Construction Engineering Corporation and 5544 Sinohydro Group. 3086 Daewoo, 5739 Hyundai Engineering and SK Eng & Construction from South Korea are also interested in the project. A bi-lateral body, Ebitan, is administering the applications, which have come from firms in Brazil, China, Italy and Korea, as well as local companies in Argentina and Chile according to Business News Americas. A list of prequalified companies is being released while the tender process is set to open in early 2014. The link will feature twin tunnels nearly 14km long connecting Argentina's San Juan province with Chile's Coquimbo region (region IV). The tunnel is of enormous economic importance to both Argentina and Chile and will help transport and trade between the two countries. The new tunnel will be able to carry traffic that presently has to use either another tunnel, or a dangerous mountain pass that is often closed in poor weather and is not suitable for heavy vehicles. As well as the twin tube tunnel itself, the project also includes upgrades to some 50km of roads in Region IV that will lead to the portal. Work will also be required to improve an airport in Region IV and improve routes 41, 43 and 45 in the region. Construction of the Agua Negra tunnel will be challenging however as both portals are at altitude, which poses severe limitations on the performance of both personnel and equipment. Winter weather conditions can be tough and access to the portal areas can be tricky in poor weather, which will further add to the challenges the construction team will face.

Related Content

  • Bolivia tunnel and highway project under construction
    February 9, 2017
    In Bolivia work is progressing on the strategic Incahuasi tunnel project – Mauro Nogarin writes In southern Bolivia, the Bolivian Highway Administrator (ABC) is supervising the construction of the Incahuasi Tunnel and Monteagudo-Muyupampa-Ipati road. This work is of fundamental importance for the country as it will improve the flow of traffic and boost trade between the departments of Santa Cruz and Chuquisaca. The Monteagudo-Ipati highway project includes the Incachuasi tunnel which has a length of 96km
  • Plans in hand for Denmark-Germany tunnel link
    January 25, 2013
    The tender pre-selection process is underway for the new tunnel link that will connect Denmark with Germany. Danish state-owned company Femern said that interest is strong in the project to build the tunnel, which will run under the Baltic Sea. So far nine consortia comprising 24 companies in all are taking part in the tender pre-selection process. The Fehmarn Belt Fixed Link will feature an immersed tunnel and its construction is expected to cost some €5.5 billion. There are four main contracts including d
  • Colombia highway – financing secured
    March 21, 2019
    The complete financing for the Autopista al Mar 1 highway project in Colombia has now been secured. Loans of US$713 million from eight banks, seven of which are international institutions, will pay for the PPP project. Firms involved in the project include the Austrian contractor STRABAG and the Spanish firm Sacyr, as well as the local company CONCLAY. Construction work is well underway for the project, which is around 30% complete. Once the highway opens for traffic, it will improve transport and trade in
  • Further delays possible for Colombia tunnel
    July 21, 2016
    Further delays to completion look a possibility for Colombia’s La Linea Tunnel project. A strike by truck drivers meant that supplies of construction materials were halted, adding to previous delays. The country’s National Road Institute (Invias) has stated that work on the tunnel does not look likely to be finished until the first quarter of 2017. The project will only be completed before that date if faster progress can be achieved with the electro-mechanical works currently in hand. Invias has previously