Skip to main content

Major Chinese highway project commencing

In China work is commencing on the Mulei-Wutongdaquan highway. The work will be carried out in China’s Xinjiang Uygur autonomous region and is costing close to US$2.6 billion. The highway will feature four lanes, with two in either direction and will measure 515km long. The project will form the last section of the Beijing-Urumqi Expressway to be completed.
April 26, 2017 Read time: 1 min
In China work is commencing on the Mulei-Wutongdaquan highway. The work will be carried out in China’s Xinjiang Uygur autonomous region and is costing close to US$2.6 billion. The highway will feature four lanes, with two in either direction and will measure 515km long. The project will form the last section of the Beijing-Urumqi Expressway to be completed.

Related Content

  • New Chinese link
    February 28, 2012
    Chinese firm Jiangsu Expressway Company is to invest a healthy US$600 million in the Kunshan-Wujiang section of the Changshu-Jiaxing Expressway.
  • Stonehenge Bypass Tunnel project facing judicial review
    February 19, 2021
    The UK’s Stonehenge Bypass Tunnel project is now facing a judicial review.
  • New Arizona freeway project commencing
    March 1, 2016
    A new freeway project is planned in Phoenix, Arizona. The joint venture for this design-build and maintain project will be led by Fluor Corporation. The package of works was awarded by the Arizona Department of Transportation (ADOT) and is for the Loop 202 South Mountain Freeway. This freeway project will be the first procured under Arizona’s public-private-partnership statute.
  • Work starting on new road tunnel in Nepal
    December 11, 2013
    Work is starting on a new road tunnel in Nepal. The tunnel will form part of a 58km highway route that will improve connectivity in the country from capital Kathmandu to Kulekhani and Hetauda. The Kathmandu - Kulekhani - Hetauda Tunnel (KKHT) HighwayTunnel (KKHT) Highway is a major project for Nepal and is being carried out under the PPP model. The 4.5km tunnel will feature four traffic lanes, and is being developed by the Nepal Purwardhar Bikash Company. In all, the 58km route will feature three tunnel sec