Skip to main content

Major Chinese highway project commencing

In China work is commencing on the Mulei-Wutongdaquan highway. The work will be carried out in China’s Xinjiang Uygur autonomous region and is costing close to US$2.6 billion. The highway will feature four lanes, with two in either direction and will measure 515km long. The project will form the last section of the Beijing-Urumqi Expressway to be completed.
April 26, 2017 Read time: 1 min
In China work is commencing on the Mulei-Wutongdaquan highway. The work will be carried out in China’s Xinjiang Uygur autonomous region and is costing close to US$2.6 billion. The highway will feature four lanes, with two in either direction and will measure 515km long. The project will form the last section of the Beijing-Urumqi Expressway to be completed.

Related Content

  • Morocco motorway widening work underway
    March 13, 2020
    Widening work is now underway for key Morocco motorway links.
  • We can be Heroes
    January 11, 2023
    Paraguay’s Puente Héroes del Chaco will provide a vital transport link for the country once it is complete, Mauro Nogarin and Mike Woof report
  • California highway project commencing at end 2017
    August 22, 2017
    Construction work on the US$3.5 billion project to widen a stretch of the I-5 highway in California will commence at the end of 2017. The project may well include a tunnel stretch under the Westfield UTC to meet environmental requirements. Once the work is complete, the newly widened highway stretch will feature increased capacity and this is expected to cut congestion and reduce journey times at peak periods. The project is moving ahead following the recent conclusion of a long term legal dispute concerni
  • Qatar reveals plans for US$12.36bn infrastructure projects
    January 16, 2014
    The Government of Qatar is reportedly near to agreeing deals for delivering a number of vital road transport and other infrastructure projects worth a combined US$12.36 billion (QAR 45 billion). Seven major expressways, other road development and repair projects, and key sewage infrastructure works make up the planned projects’ package. The expressway projects will have a combined road length of 900km, subways, flyovers and 240 major interchanges. In addition, the expressway projects will also include a h