Skip to main content

Key highway project for Norway

The Norwegian Public Roads Administration, Statens Vegvesen , has awarded contracts for the E6 highway to Implenia and KA Austad and for the E18 south of capital Oslo. The E6 contract relates to the stretch connecting Vinstra and Sjoa in Gudbrandsdalen and is worth some €185.71 million. The construction work is now commencing and will take until October 2016 to complete. The project is for 16km of the E6 however it will include tunnel construction work. Hard, competent rock conditions mean that drill and bl
January 9, 2014 Read time: 2 mins
RSSThe Norwegian Public Roads Administration, 1208 Statens Vegvesen , has awarded contracts for the E6 highway to 2552 Implenia and KA Austad and for the E18 south of capital Oslo. The E6 contract relates to the stretch connecting Vinstra and Sjoa in Gudbrandsdalen and is worth some €185.71 million. The construction work is now commencing and will take until October 2016 to complete. The project is for 16km of the E6 however it will include tunnel construction work. Hard, competent rock conditions mean that drill and blast tunnel techniques are commonly used in Norway though at this stage the tunneling method to be used has not been revealed. The project is of particular note as the E6 highway is of importance for Norway. While the country is one of Europe’s most affluent, its highway network outside of capital Oslo has been criticised and the E6 project represents an important step in improving the overall network.

Meanwhile Statens Vegvesen awarded the E18 contract to Swedish contractor 5211 NCC. The deal is for a 6.25km stretch of road and is worth €95.81 million, with the highway featuring four lanes with two in either direction. The project includes the construction of no less than 10 bridges, as well as improvements the drainage system in Hobøl Municipality. The work is due for completion in 2016.

For more information on companies in this article

Related Content

  • Norwegian tunnel incident provokes criticism
    March 16, 2015
    Controversy has arisen with regard to a Norwegian tunnel incident in 2013. A fire broke out in the Gudvanga Tunnel and resulted in 67 vehicle occupants being trapped, with 28 having to receive treatment for smoke inhalation. Norway’s Accident Investigation Board (Statens havarikommisjon) has criticised the National Road Administration (Statens vegvesen) over the incident. According to Statens havarikommisjon, there was insufficient information provided to those people in the tunnel at the time of the incide
  • Norway’s massive Rogfast project
    January 31, 2025
    Norway’s massive Rogfast tunnel project will boost connectivity.
  • Oslo Fjord Link a priority for 2024
    October 20, 2023
    The new tunnel will run parallel with the existing 7.3km-long structure which connects Hurum and Frogn near the Norwegian capital Oslo.
  • HAB wins Oslo E18 tunnel work
    March 20, 2023
    Work starts this summer on the Bygdøylokket and Sjølystlokket tunnels on European Route 18.