Skip to main content

Oslo Fjord Link a priority for 2024

The new tunnel will run parallel with the existing 7.3km-long structure which connects Hurum and Frogn near the Norwegian capital Oslo.
October 20, 2023 Read time: 2 mins
The E134 Oslo Fiord Link will see major improvements to connections around the capital city Oslo (image Norwegian Public Roads Administration - Statens Vegvesen)

The Norwegian government wants to prioritise work on the E134 Oslo Fiord Link project in 2024, according to the proposed national budget.

The road and tunnel project construction of a new tunnel parallel with the existing 7.3km-long structure which connects Hurum and Frogn. It carries three lanes reaches a depth of 134m below sea level.

The project was approved in 2015. The first phase of construction of the Oslo Fjord tunnel was started in 2000 and included the construction of the E134 from BjÃ3rnstad in the municipality of RÃ3yken to Vassum in the municipality of Frogn. The Oslo Fjord tunnel between MÃ3na and Verpen, the Frogntunnel and the tunnel are part of the E134 and the Oslo Fjord connection.

Works will include widening of the road from two to four lanes between the tunnel opening at MÃ3na leading 6km to the E6 at Vassum and includes expansion work on the short BrÃ3tan bridge.

Jon-Ivar Nygård, minister of transport, said the project has been ranked number one by the Norwegian Public Roads Administration - Statens Vegvesen. It is part of an outer ring road in Oslo, connecting highways E6 and E18 south of the city.

Meanwhile, the government has set aside funds in the national budget for 2024 to continue preparatory work for the new road and railway between Arna and Stanghelle. Nygård said a new E16 highway and a new Voss rail line on the section are important to improve both accessibility and traffic safety on the main thoroughfare east of Bergen.

The latest cost assessment was for around €2.57 billion. Further progress on the joint project will be considered by the government in a new National Transport Plan to be presented in early next year.
 

For more information on companies in this article

Related Content

  • Norway’s E10 project is officially underway
    August 7, 2023
    Hålogalandsvegen/Skanska will finance, build, maintain and operate a section of the E10 Hålogalandsvegen and Highway 85 Tjeldsund–Gullesfjordbotn–Langvassbukt north of the Arctic Circle.
  • Norway transport budget boost
    October 21, 2022
    Norway is seeing a transport budget boost for 2023.
  • Norwegian road projects planned
    October 22, 2021
    The Norwegian Government is planning a series of major road projects.
  • Norway drops tender plans for second Sotra fixed link
    February 18, 2019
    Statens Vegvesen, the Norwegian Road Administration, has cancelled tender plans for a new Sotra fixed link project that were scheduled for the spring. Jon Georg Dale, minister of transport, recently told the Norwegian Parliament that the geology near Lake Storavatnet along the route of the project, of which the second bridge would be a part, has caused concern among planners. Also, reconstruction of a high-voltage power cable has come under questions. Helge Eidsnes, a regional manager of Statens Vegve