Skip to main content

Houston bridge project, construction paused

Work is being paused on the construction of the new Ship Channel Bridge replacement project close to Houston, Texas.
By MJ Woof January 20, 2020 Read time: 1 min
Construction of the pylons for Houston’s Ship Channel Bridge is being paused for redesign work to be carried out, though other portions of the link are still being built: Image © courtesy of Harris County Toll Road Authority

The Harris County Toll Road Authority (HCTRA) is pausing work to build the main pylons for the cable-stayed portion of the new Sam Houston Tollway Ship Channel Bridge. This will give time to review the design of the section of bridge being constructed at present. The consulting and engineering firm COWI identified an issue related to the design of the curved portions of the pylon legs. Pausing the construction will provide time for the engineer of record (FIGG) to design a solution. This will then be reviewed by COWI. When COWI and FIGG agree on the design changes, construction work for the pylons will be able to resume.

However, work will continue for other sections of the project, such as the approaches.

Related Content

  • Renfrew Bridge opening tests complete
    August 28, 2024
    The 184m-long cable-stay bridge near Glasgow, Scotland, will be the first road bridge across the River Clyde to open for passing ships.
  • Texas DoT awards Atkins major contract
    July 18, 2014
    The Texas Department of Transportation (TxDOT) has awarded Atkins a major, six-year contract worth US$25 million. This will cover right-of-way (ROW) oversight, compliance review, and utility coordination services for transportation-related public-private partnership projects in the state. The deal calls for Atkins to serve as TxDOT’s management consultant, overseeing projects being hand;ed under development agreements, design-build contracts, and other delivery methods. Atkins has worked with TxDOT on a wid
  • Helsinki approves the Crown Bridges – Kruunusillat - project
    September 22, 2016
    Helsinki City Council has approved construction of the Crown Bridges – Kruunusillat – Project, that at 3km will be the longest bridge in Finland. The bridge will carry pedestrians, cyclists and trams between the city centre and the 143 hectare Kruunuvuorenranta development to the east which will have over 580,000m² of residential space and 6,000 housing units. The centrepiece of the €259 million scheme, as designed by WSP Finland and Knight Architects, will be the 1.2km span crossing of the main bay,
  • Historic bridge upgrade in Minneapolis
    July 28, 2022
    A historic bridge upgrade in Minneapolis is close to completion.