Skip to main content

Houston bridge project, construction paused

Work is being paused on the construction of the new Ship Channel Bridge replacement project close to Houston, Texas.
By MJ Woof January 20, 2020 Read time: 1 min
Construction of the pylons for Houston’s Ship Channel Bridge is being paused for redesign work to be carried out, though other portions of the link are still being built: Image © courtesy of Harris County Toll Road Authority

The Harris County Toll Road Authority (HCTRA) is pausing work to build the main pylons for the cable-stayed portion of the new Sam Houston Tollway Ship Channel Bridge. This will give time to review the design of the section of bridge being constructed at present. The consulting and engineering firm COWI identified an issue related to the design of the curved portions of the pylon legs. Pausing the construction will provide time for the engineer of record (FIGG) to design a solution. This will then be reviewed by COWI. When COWI and FIGG agree on the design changes, construction work for the pylons will be able to resume.

However, work will continue for other sections of the project, such as the approaches.

Related Content

  • Webuild proposes Baltimore Bridge design
    May 6, 2024
    VIDEO: The project in the US state of Maryland to replace the collapsed Francis Scott Key Bridge was made free of charge ahead of tomorrow’s state-led virtual industry forum for reconstruction of the bridge.
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Taiwan bridge link project moving ahead
    February 23, 2017
    Construction of the Kinmen Bridge in Taiwan has now been resumed, with work having restarted on the project in late 2016. The bridge will be 5.4km long in all and will have a 1.05km long main section, connecting the islands of Greater Kinmen and Little Kinmen (also known as Lieyu). The project includes building approach roads for the bridge as well as cuttings and connecting ramps. Costing US$292 million and with funding being provided jointly by Taiwan’s Government and the local authorities, the bridge is
  • Ho Chi Minh City pushes ahead with Thu Thiêm Bridge 4 project
    April 18, 2017
    Authorities in Vietnam’s southern Ho Chi Minh City are seeking prime ministerial approval for the nearly 2.2km-long Thu Thiêm Bridge 4 project. The six-lane bridge will cost more than US$230 million and be a build-transfer contract, according to a report in the Vietnam Investment Review. In September, Ho Chi Minh’s City’s People’s Committee said it is considering three investors for the work - Phát Đạt Corporation Real Estate Development, Investment Corporation 620 and 168 Construction Development Investmen