Skip to main content

Helsinki approves the Crown Bridges – Kruunusillat - project

Helsinki City Council has approved construction of the Crown Bridges – Kruunusillat – Project, that at 3km will be the longest bridge in Finland. The bridge will carry pedestrians, cyclists and trams between the city centre and the 143 hectare Kruunuvuorenranta development to the east which will have over 580,000m² of residential space and 6,000 housing units. The centrepiece of the €259 million scheme, as designed by WSP Finland and Knight Architects, will be the 1.2km span crossing of the main bay,
September 22, 2016 Read time: 2 mins
Finland’s longest, the Kruunusillat bridge project
Helsinki City Council has approved construction of the Crown Bridges – Kruunusillat – Project, that at 3km will be the longest bridge in Finland.

The bridge will carry pedestrians, cyclists and trams between the city centre and the 143 hectare Kruunuvuorenranta development to the east which will have over 580,000m² of residential space and 6,000 housing units.

The centrepiece of the €259 million scheme, as designed by WSP Finland and Knight Architects, will be the 1.2km span crossing of the main bay, named the Kruunuvuorensilta. The central 135m pylon of the symmetrical cable-stayed design is a tall slender diamond, with multi-faceted surfaces designed to catch light and shadow both by day and night.

WSP has said that the “design is based on a 200-year lifetime” despite being located “in an aggressive marine environment”. The three-dimensional diamond shaped tower is highlighted with facade lighting that changes on festive days. Lights on tramways and bicycle and pedestrian lanes will create an iconic shape on the horizon.

The centre of the bridge consists of two 260m-long cable-stayed main spans supported by a single pylon. The approach spans is a continuous composite girder bridge.

“It will extend Helsinki’s excellent public-transport system, significantly reduce journey times, and create a critical link to new developments. This will be a high-quality, lasting piece of infrastructure, which will be instantly recognisable and synonymous with Helsinki,” said Tom Osborne, project architect.

The project will now enter the detailed design phase, with construction due to start on site in autumn 2018. The tramway is due to be opened to the public in 2025.

Related Content

  • Kuwait’s Sheikh Jaber al-Ahmad Al-Sabah Causeway opens
    August 27, 2019
    World Highways revisits the world’s fourth longest sea bridge - four years to construct and which has slashed travel time between Kuwait’s largest island and the capital city
  • VIDEO: Gap closed for Gordie Howe Bridge
    July 26, 2024
    A 26m gap in the deck was recently closed on the bridge that will connect Detroit in the US state of Michigan and Windsor in the Canadian province of Ontario.
  • Gordie Howe Bridge opening date set
    January 15, 2024
    The bridge connecting Detroit in the US state of Michigan and Windsor in the Canadian province of Ontaria will open in September next year.
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo