Skip to main content

Damaged Norwegian bridge undergoes successful demolition

A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to
February 23, 2015 Read time: 2 mins
A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to 8006 Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to remove the damaged structure instead.

The collapse of the structure has prompted questions as to the safety of other bridges in Norway and it has since transpired that checks carried out previously may have been insufficient. The slippage that spelled the fate of the Skjeggestad Bridge was related to the presence of a type clay, which can become unstable when under stress and in the presence of water.

For more information, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 20623 0 oLinkInternal visit this page Norwegian bridge collapse prompts further investigations false /categories/road-highway-structures/news/norwegian-bridge-collapse-prompts-further-investigations/ false false%>

For more information on companies in this article

Related Content

  • Sennebogen shows dragline at INTERMAT
    April 19, 2012
    While draglines are now a rarity, Sennebogen showed its 50tonne operating weight duty cycle crawler crane, the 650HD, with 2.33 dragline bucket. The machine is one of a 10-model range with operating weights from 20-180tonnes and engines between 119 and 708kW. It can be used in civil engineering, mining, demolition or material handling.
  • Skidmarks
    December 15, 2017
    Our Skidmarks page is highly rated by readers. Your input could help make this page even more entertaining. If you come across any amusing road-related stories or pictures email me at [email protected]
  • Tecnoidea Impianti plants reputation worldwide
    April 9, 2013
    With over 3,600,000m³ of water purified daily in more than 3,000 of its plants all over the world, Tecnoidea Impianti is one of the leading companies worldwide for water purification plants and sludge treatment systems. Its closed-cycle plants are aimed at marble and granites, aggregates and soil washing, tunnelling and concrete areas.
  • IRF Supports Capacity Building for Performance-Based Road Contracts
    December 23, 2014
    For 10 days in October, more than 40 highway engineering professionals from 14 different countries congregated in Orlando, Florida, USA. With lecturers from The Netherlands, Finland, New Zealand, Canada and the US the group discussed the specifics about how to effectively write, implement and enforce performance-based contracts.