Skip to main content

Colombia bridge a cause for concern

The Hisgaura Bridge in Colombia remains a source of concern over its structure. The 653m bridge forms part of the Málaga—Los Curos highway and features the longest central span, at 400m, of any cable-stayed bridge in South America. However, Colombia's National Road Institute (Invias) has expressed its doubts over the bridge. Instability and potential high maintenance costs have been cited by Invias as grounds for this concern. The deck of the central section of the bridge is not properly level. It is not c
February 26, 2019 Read time: 1 min

The Hisgaura Bridge in Colombia remains a source of concern over its structure. The 653m bridge forms part of the Málaga—Los Curos highway  and features the longest central span, at 400m, of any cable-stayed bridge in South America. However, Colombia's National Road Institute (2812 Invias) has expressed its doubts over the bridge. Instability and potential high maintenance costs have been cited by Invias as grounds for this concern. The deck of the central section of the bridge is not properly level. It is not clear if this can be repaired or if it will have to be rebuilt.

For more information on companies in this article

Related Content

  • Conference highlights Mexico's highway investment
    February 27, 2012
    At the recent PIARC World Road Conference in Mexico City the country’s president, Felipe Calderon, made a keynote opening address. Calderon emphasised that infrastructure investment and expansion forms a crucial component in the country’s future economy and as such, has been a priority for his administration. Calderon took office in 2006 and by the end of this year Mexico will have built or rebuilt some 19,000km of roads and highways in the country. Due to its proximity to the US, Mexico is highly dependen
  • Colombia key tunnel project – new completion date
    March 6, 2019
    A new completion date has been set for the La Linea Tunnel project in Colombia. The work should now be finished in late 2020, although the project was originally intended to be ready by late 2016. The various contracts to complete the Cruce de la Cordillera Central route will be awarded in April 2019 by the national road institute (Invias). The contracts will include strict measures to ensure that contractors will comply with all the terms of the deal. The Colombian Government previously allotted US$204.5 m
  • Further delays possible for Colombia tunnel
    July 21, 2016
    Further delays to completion look a possibility for Colombia’s La Linea Tunnel project. A strike by truck drivers meant that supplies of construction materials were halted, adding to previous delays. The country’s National Road Institute (Invias) has stated that work on the tunnel does not look likely to be finished until the first quarter of 2017. The project will only be completed before that date if faster progress can be achieved with the electro-mechanical works currently in hand. Invias has previously
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o