Skip to main content

Strasbourg bypass surveys halted over environmental concerns

Further delays are looming for construction of the western Strasbourg bypass, a controversial toll motorway project in north eastern France. The government is concerned about environmental issues after Arcos, the wholly-owned subsidiary of Vinci responsible for building the bypass, said it was going to carry out field surveys in 1.5 hectares of what many consider environmentally sensitive areas.
September 27, 2017 Read time: 2 mins
Further delays are looming for construction of the western Strasbourg bypass, a controversial toll motorway project in north eastern France.


The government is concerned about environmental issues after Arcos, the wholly-owned subsidiary of 5177 Vinci responsible for building the bypass, said it was going to carry out field surveys in 1.5 hectares of what many consider environmentally sensitive areas.

The project, which Arcos estimates at €553 million, is likely headed for a public inquiry towards the end of the year, according to media reports, with a construction start sometime in 2018.

In late 2015, French construction group Vinci’s consortium was named preferred bidder for the project. The win for Vinci came two years after winning the same contract, but which was cancelled over a lack of secure financing.

The 24km project is officially the tolled A355 Grand Contournement Ouest, a public-private partnership deal.

World Highways reported in March 2012 that the project was expected to cost up to €756 million, compared with the original estimate of €400 million quoted during the call to tender in 2009.

Construction was to have started in 2013 for opening by early 2017 at the latest.

For more information on companies in this article

Related Content

  • UK’s embarrassing road conditions
    January 17, 2025
    The UK’s roads are a national embarrassment.
  • Slovakia tunnel sections underway but some delays
    January 23, 2018
    The route for new tunnel links for Slovakia’s D1 highway has been agreed. New tunnels now look set to be built on the 13.5km stretch between Turany and Hubova section of the D1 highway. This plan calls for the construction of the Korbelka and Havran tunnels at an estimated cost of €900 million. Building these two links would bypass the Lower Fatra mountain range, with the Korbelka Tunnel measuring 5.9km and the Havran Tunnel measuring 2.9km long. The Slovak Environment Ministry rejected an appeal against th
  • Testing time for Tlicho all-season gravel road in Canadian north
    January 27, 2020
    Contractors on the 97km Tlicho all-season gravel road in Canada’s far north are on site despite not having all proper approvals, according to Canadian media.
  • Highway developments to boost east-west transport
    April 4, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports History was made in late 2010, when one of the biggest road building projects ever envisaged in Eastern Europe was given the green-light. It was the occasion when Russian president Dmitry Medvedev signed a law that would allow his country to build its segment of a huge highway around the Black Sea. The idea is to complete the 7,140km highway, wi