Skip to main content

Parsons is handling a major interchange project in North Carolina

Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the North Carolina Department of Transportation (NCDOT).
June 21, 2017 Read time: 2 mins
RSS

3220 Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the 4027 North Carolina Department of Transportation (NCDOT).

It involves carrying out design services under a planning and design limited services contract for the I-26/US 74/NC 108 interchange improvement, located in Polk County, North Carolina. The project will provide ramp connections between westbound I-26 to eastbound US 74 and westbound US 74 to eastbound I 26. The work also involves the modernisation of NC 108 from west of Old Highway 19 to the intersection of Walker Road in Columbus.

Direct connections between the two major routes will lower congestion at the interchange, where interstate through-traffic is currently forced to exit the highway and travel through roundabouts on NC 108 before entering either US 74 or I-26.

Parsons and its team members will be responsible for all final designs, including National Environmental Policy Act documentation, as well as participation in public involvement activities.

The improvements to the I-26/US 74 ramps are scheduled to open prior to the Federal Equestre Internationale World Equestrian Games, which will be held in North Carolina in September 2018.

For more information on companies in this article

Related Content

  • Parsons wins award for Caldecott Tunnel
    November 8, 2013
    Parsons has won an award for its work on the Caldecott Fourth Bore Project. The award comes from Roads & Bridges magazine as the top (US) road project of 2013. Parsons worked as prime consultant on the US$417 million tunnel project, working with Jacobs Associates. The project involved constructing a fourth bore through the Berkeley Hills, near Oakland, California. Parsons was responsible for preliminary engineering and the final design of the tunnel, the operations building, and two associated roadway proje
  • Virginia project for Parsons
    June 28, 2016
    Parsons has won a deal to design and installation of the nation’s first all-lane, dynamic-priced tolling system on a 16km segment of Interstate 66 in Virginia. This stretch of highway runs from Interstate 495, the Capital Beltway, to US Route 29 in Rosslyn, Virginia. Dynamic tolling, able to adjust toll pricing to demand, will operate in the peak travel direction during weekday rush hours. This will help lower traffic congestion into and out of US capital Washington, DC.
  • Parsons Brinckerhoff is working on a key project in North Carolina
    May 7, 2013
    Parsons Brinckerhoff is now working with Blythe Construction on a US$69 million project for the Salem Creek Connector in Winston-Salem. The deal was awarded by the North Carolina Department of Transportation (NCDOT) and the two companies are handling the design and construction for a 1.7km section of four-lane highway on US52, which includes concrete pavement widening work. The project includes a new diverging diamond interchange and eight new bridges, including two railroad bridges. The new roadway is red
  • $3.2 billion express lanes contract for North Carolina
    July 1, 2025
    A $3.2 billion express lanes contract is opening for bids in North Carolina.