Skip to main content

Parsons is handling a major interchange project in North Carolina

Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the North Carolina Department of Transportation (NCDOT).
June 21, 2017 Read time: 2 mins
RSS

3220 Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the 4027 North Carolina Department of Transportation (NCDOT).

It involves carrying out design services under a planning and design limited services contract for the I-26/US 74/NC 108 interchange improvement, located in Polk County, North Carolina. The project will provide ramp connections between westbound I-26 to eastbound US 74 and westbound US 74 to eastbound I 26. The work also involves the modernisation of NC 108 from west of Old Highway 19 to the intersection of Walker Road in Columbus.

Direct connections between the two major routes will lower congestion at the interchange, where interstate through-traffic is currently forced to exit the highway and travel through roundabouts on NC 108 before entering either US 74 or I-26.

Parsons and its team members will be responsible for all final designs, including National Environmental Policy Act documentation, as well as participation in public involvement activities.

The improvements to the I-26/US 74 ramps are scheduled to open prior to the Federal Equestre Internationale World Equestrian Games, which will be held in North Carolina in September 2018.

For more information on companies in this article

Related Content

  • Parsons wins Kentucky interchange deal
    December 1, 2017
    A team of specialists from Parsons is now commencing work on developing a series of options for the I-265/I-64 Interchange project in Kentucky.
  • I-95 Corridor Coalition vehicle probe project massively expanded
    May 4, 2012
    The I-95 Corridor Coalition, the University of Maryland and Inrix have announced a three-year extension and expansion of the I-95 Coalition Vehicle Probe Project (VPP), operational since 2008, that uses crowd-sourced traffic data and advanced analytics techniques to turn billions of data points into insights that are transforming the manner in which member states build, manage and measure their road networks.
  • Florida highway rebuild project
    May 2, 2018
    Rebuilding a congested stretch of highway in Florida will cut congestion and boost safety for commuters - Mike Woof writes. Florida’s 214km-long I-4 highway provides a key transport route between Tampa and Daytona Beach, but has an unenviable reputation for both congestion and safety, with frequent delays due to heavy traffic as well as crashes. The stretch running through the city of Orlando is particularly prone to jams at peak periods, with huge traffic volumes resulting in vehicles having to slow to a c
  • Parsons wins Florida interchange redesign contract
    February 23, 2017
    The Florida Department of Transportation has awarded Parsons a contract to carry out an analysis of the I-95 Interchange with LPGA Boulevard in Volusia County. The contract involves analysing the conceptual layout and ultimate reconfiguration of the interchange, followed by providing final design services once the best solution has been selected. The work is needed as traffic and congestion are expected to increase due to the rise in residential and commercial development in the Daytona Beach area. The I-9